JS Niyodo

Mogami-class frigate From Wikipedia, the free encyclopedia

Niyodo (によど) is a frigate of the Japan Maritime Self-Defense Force (JMSDF), and the seventh ship of the Mogami class. She was named after the Niyodo River,[4] and the second ship to be named so, after the Chikugo-class destroyer escort JDS Niyodo.[5][1] The Imperial Japanese Navy had plans to name the second Oyodo-class cruiser after the Niyodo River, but her construction was cancelled.[4]

NameNiyodo
Laid down30 June 2022[2]
Quick facts History, Japan ...
Launch ceremony of the Niyodo
History
Japan
NameNiyodo
NamesakeNiyodo River[1][2]
BuilderMitsubishi Heavy Industries, Nagasaki[1][2]
Laid down30 June 2022[2]
Launched26 September 2023[1][2]
Commissioned21 May 2025[3]
IdentificationPennant number: FFM-7
StatusActive
General characteristics
Class & typeMogami-class frigate
Displacement
  • 3,900 tons standard[1]
  • 5,500 tons full load[1]
Length132.5 m (434 ft 9 in)[1]
Beam16.3 m (53 ft 6 in)[1]
Draft9 m (29 ft 6 in)[1]
Propulsion
Speed30 knots (56 km/h; 35 mph)[1]
Boats & landing
craft carried
2 × RHIB, UUV, USV
Crewaround 90[1]
Sensors &
processing systems
  • OPY-2 (X-band multi-purpose AESA radar)
  • OAX-3(EO/IR)
  • OQQ-25 (VDS + TASS)[1]
  • OQQ-11 (Mine-hunting sonar)
  • OYQ-1 (Combat management system)
  • OYX-1-29 (Console display system)
Electronic warfare
& decoys
NOLQ-3E (Passive radar system + Electronic attack capability is integrated into the main radar antenna), Chaff dispenser
Armament
Aircraft carried1 × SH-60L helicopter
Close

Construction and career

Niyodo was ordered in March 2022 (for about 47.4 billion yen)[1] by Mitsubishi Heavy Industries as part of the JMSDF's Mid-Term Defense Program and was laid down at MHI's Nagasaki Shipyard on 30 June 2022.[2] She was named and launched on 26 September 2023.[6][1][2] Although the Mk.41 VLS was included in the 2021 supplementary budget, it was decided that it will be fitted later due to the global semiconductor shortage.[7] After fitting out and undergoing a series of sea trials, the ship was originally scheduled to be commissioned in December 2024.[8] The schedule was later pushed back to 21 May 2025,[3] and according to journalist Kosuke Takahashi, it is uncertain whether or not the delayed commissioning date allowed the Mark 41 VLS to be fitted, or a decision made by the JMSDF to equip the VLS during Niyodo's fitting out process.[9] While Niyodo was eventually commissioned and assigned to the 12th Escort Fleet based at Kure, Takahashi disclosed a statement by the Public Relations Office of the Maritime Staff Office that the COVID-19 pandemic had also delayed the ship's entry to service.[10]

Notes

  1. To be equipped later.

References

Related Articles

Wikiwand AI