Jagorawi Toll Road
Toll road in Indonesia
From Wikipedia, the free encyclopedia
| Jakarta–Bogor–Ciawi Toll Road | |
|---|---|
| Jalan Tol Jakarta–Bogor–Ciawi | |
| Jagorawi Toll Road | |
Southbound Jagorawi Toll Road heading to Citeureup, Bogor Regency in 2019 | |
| Route information | |
| Maintained by Jasa Marga | |
| Length | 59 km (37 mi) |
| Existed | 9 March 1978–present |
| History | Built in 1973-1978 |
| Major junctions | |
| North end | Cawang |
| |
| South end | Ciawi |
| Location | |
| Country | Indonesia |
| Provinces | |
| Major cities | |
| Highway system | |
The Jakarta–Bogor–Ciawi Toll Road (Indonesian: Jalan Tol Jakarta-Bogor-Ciawi) or shortened to Jagorawi Toll Road/Jalan Tol Jagorawi is the first controlled-access toll road in Indonesia. Construction of the highway began in 1973, and it was officially opened on 9 March 1978.[1]
The Jagorawi Toll Road links the capital city of Jakarta to the West Javanese cities of Bogor and Ciawi. It has a length of around 59 kilometres (37 mi) going north and southbound and is operated by Jasa Marga, a state-owned enterprise.
The toll road has achieved break-even point,[2] making it the cheapest toll road in Indonesia based on price per kilometer.[3]
History
In 1973, the Indonesian government began developing the first highway linking the capital Jakarta with the city of Bogor. When the road was still in its construction phase, it was not officially a toll road. When the highway was nearly finished, the government began considering ways to execute the operation and maintenance of the highway autonomously, without burdening governmental financing. For that purpose, the Labor Department suggested that the portion of the road between Jakarta and Bogor be changed to a toll road.[4]
The construction of the Jagorawi Toll Road began in 1975, with funding supported by a loan from the United States Agency for International Development (USAID).[5] The infrastructure enterprise gained momentum following a plan by American investor Kaiser Cement to establish a 1.2 million-ton annual output facility in Cibinong, prompting company delegate Nick P. Petroff to advocate for US financial assistance on behalf of the Indonesian state. Capital allocation for the project was divided on a 70–30 basis, where the US covered $22.8 million while Indonesia injected $10.3 million, both channeling these resources as equity into PT Jasa Marga (Persero) Tbk.[6]
Execution of the physical works was entrusted to South Korean contractor Hyundai Construction Co., overseen by American supervisory consultants Ammann-Whitney & Trans Asia Engineering Associates Inc. While engaging international firms generated debate regarding the participation of domestic professionals, President Suharto emphasized that many Indonesian workers were directly involved in the build.[6]
Private investors, with government financing, established the semi-private corporation Jasa Marga to manage the highway on 1 March 1978.[7] The road was officially inaugurated in a ceremony on 9 March 1978 by President Suharto.[4] The remaining Cibinong–Bogor and Bogor–Ciawi segments opened in 1979.[6]
In 2017, PT Jasa Marga issued securities backed by the toll revenues from Jagorawi.[8]
Exits
| Province | Location | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|
| Special Capital Region of Jakarta | Kramat Jati, East Jakarta | 0 | 0.0 | ||||
| 2.4 | 1.5 | Cililitan Toll Gate | Jakarta Inner Ring Road-bound only | ||||
| 3 | 1.9 | 3 | Cawang Ramp |
| |||
| Makasar, East Jakarta | 4.2 | 2.6 | 4 | Ramp Taman Mini Toll Gate | |||
| 6.0 | 3.7 | 6 | Dukuh/Pasar Rebo Interchange |
| |||
| Cipayung, East Jakarta | 13.0 | 8.1 | 13 | Cibubur Toll Gate | |||
| West Java | Cimanggis, Depok | 15.6 | 9.7 | 16 | Cimanggis Interchange |
| |
| Tapos, Depok | 19.2 | 11.9 | 19 | Cimanggis Toll Gate |
| South-bound exit, south-bound entry, & north-bound entry only. | |
| Gunung Putri, Bogor Regency | 23.8 | 14.8 | 24 |
|
| ||
| Citeureup, Bogor Regency | 26.4 | 16.4 | 27 | Citeureup Toll Gate | |||
| Babakan Madang, Bogor Regency | 32.1 | 19.9 | 32 | Sentul Toll Gate |
| ||
| 36.1 | 22.4 | 37 | Sentul Selatan Toll Gate | ||||
| North Bogor, Bogor | 40.0 | 24.9 | 40 | Bogor Toll Gate |
| ||
| East Bogor, Bogor | 41.2 | 25.6 | Ciawi 2 Toll Gate |
| North-bound only | ||
| Sukaraja, Bogor Regency | 42.2 | 26.2 | 42 | Bogor Selatan Toll Gate |
| South-bound exit & North-bound entry only | |
| 44.3 | 27.5 | Ciawi Toll Gate | South-bound only | ||||
| Ciawi, Bogor Regency | 46.4 | 28.8 | 46 | Puncak Ramp | South-bound exit & North-bound entry only | ||
| 47.0 | 29.2 | 47 | Ciawi Ramp | ||||
| East Bogor, Bogor | 47.2 | 29.3 | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||
Facilities
Notable accidents
On 8 September 2013, the toll road has been a nationwide media attention following a fatal accident involving Ahmad Dhani and Maia Estianty's youngest son Abdul Qodir Jaelani. Seven people were killed and 8 people were severely injured in the crash. It was revealed that Abdul lost control of his car and hit the metal separator while traveling home from Bogor to Jakarta, crashing into two oncoming vehicles on the opposite lane.[10]
Floods
For the first time in January 2014, Jagorawi Toll Road was flooded from Cipinang River at KM 4. The toll road was still operational in both directions, with vehicles driving slowly through the flood. Consequently, the toll road suffered from severe gridlock.[11]
Ciawi–Sukabumi Toll Road
Ciawi–Sukabumi Toll Road is a planned 54-km extension of Jagorawi Toll Road, subdivided into 4 sections:[12]
- Ciawi–Cigombong, 15 km (9.3 mi)
- Cigombong–Cibadak, 12 km (7.5 mi)
- Cibadak–West Sukabumi, 14 km (8.7 mi)
- Cisaat–East Sukabumi, 13 km (8.1 mi)
Concession is held by PT Trans Jabar Toll, a subsidiary of state-owned developer Waskita Karya.[13] Land acquisition by January 2013 was at 40 percent, and Trans Jabar predicted that the construction would begin by the end of 2013. However, construction was delayed due to problems with land acquisition.[14] President Joko Widodo renewed the government's efforts to complete land acquisition in 2016.[15] The Ciawi–Cigombong section was opened in December 2018. Construction on the second section, Cigombong–Cibadak, was 76.50% complete by February 2021; the projected completion date is August 2021.[16]