Wikiwand AI

Jagorawi Toll Road

Toll road in Indonesia From Wikipedia, the free encyclopedia

06°15′11″S 106°52′22″E

Length59 km (37 mi)
Existed9 March 1978–present
HistoryBuilt in 1973-1978
NorthendCawang
Quick facts Jakarta–Bogor–Ciawi Toll Road, Route information ...
Jakarta–Bogor–Ciawi Toll Road
Jalan Tol Jakarta–Bogor–Ciawi
Jagorawi Toll Road
Jakarta-Bogor-Ciawi (JBC) Toll Road (Jalan Tol 2), August 2019 (7).jpg
Southbound Jagorawi Toll Road heading to Citeureup, Bogor Regency in 2019
Route information
Maintained by Jasa Marga
Length59 km (37 mi)
Existed9 March 1978–present
HistoryBuilt in 1973-1978
Major junctions
North endCawang
Major intersections
South endCiawi
Location
CountryIndonesia
Provinces
Major cities
Highway system
Close

The Jakarta–Bogor–Ciawi Toll Road (Indonesian: Jalan Tol Jakarta-Bogor-Ciawi) or shortened to Jagorawi Toll Road/Jalan Tol Jagorawi is the first controlled-access toll road in Indonesia. Construction of the highway began in 1973, and it was officially opened on 9 March 1978.[1]

The Jagorawi Toll Road links the capital city of Jakarta to the West Javanese cities of Bogor and Ciawi. It has a length of around 59 kilometres (37 mi) going north and southbound and is operated by Jasa Marga, a state-owned enterprise.

The toll road has achieved break-even point,[2] making it the cheapest toll road in Indonesia based on price per kilometer.[3]

History

In 1973, the Indonesian government began developing the first highway linking the capital Jakarta with the city of Bogor. When the road was still in its construction phase, it was not officially a toll road. When the highway was nearly finished, the government began considering ways to execute the operation and maintenance of the highway autonomously, without burdening governmental financing. For that purpose, the Labor Department suggested that the portion of the road between Jakarta and Bogor be changed to a toll road.[4]

The construction of the Jagorawi Toll Road began in 1975, with funding supported by a loan from the United States Agency for International Development (USAID).[5] The infrastructure enterprise gained momentum following a plan by American investor Kaiser Cement to establish a 1.2 million-ton annual output facility in Cibinong, prompting company delegate Nick P. Petroff to advocate for US financial assistance on behalf of the Indonesian state. Capital allocation for the project was divided on a 70–30 basis, where the US covered $22.8 million while Indonesia injected $10.3 million, both channeling these resources as equity into PT Jasa Marga (Persero) Tbk.[6]

Execution of the physical works was entrusted to South Korean contractor Hyundai Construction Co., overseen by American supervisory consultants Ammann-Whitney & Trans Asia Engineering Associates Inc. While engaging international firms generated debate regarding the participation of domestic professionals, President Suharto emphasized that many Indonesian workers were directly involved in the build.[6]

Private investors, with government financing, established the semi-private corporation Jasa Marga to manage the highway on 1 March 1978.[7] The road was officially inaugurated in a ceremony on 9 March 1978 by President Suharto.[4] The remaining Cibinong–Bogor and Bogor–Ciawi segments opened in 1979.[6]

In 2017, PT Jasa Marga issued securities backed by the toll revenues from Jagorawi.[8]

Exits

More information Province, Location ...
ProvinceLocationkmmiExitNameDestinationsNotes
Special Capital Region of JakartaKramat Jati, East Jakarta00.0 Jakarta Inner Ring Road
2.41.5Cililitan Toll GateJakarta Inner Ring Road-bound only
31.93Cawang Ramp
  • Northern terminus
  • North-bound exit & South-bound entry only
Makasar, East Jakarta4.22.64Ramp Taman Mini Toll Gate
6.03.76Dukuh/Pasar Rebo Interchange
Cipayung, East Jakarta13.08.113Cibubur Toll Gate
West JavaCimanggis, Depok15.69.716Cimanggis Interchange
Tapos, Depok19.211.919Cimanggis Toll Gate
South-bound exit, south-bound entry, & north-bound entry only.
Gunung Putri, Bogor Regency23.814.824
  • Gunung Putri Toll Gate
  • Karanggan Toll Gate
Citeureup, Bogor Regency26.416.427Citeureup Toll Gate
Babakan Madang, Bogor Regency32.119.932Sentul Toll Gate
36.122.437Sentul Selatan Toll Gate
North Bogor, Bogor40.024.940Bogor Toll Gate
East Bogor, Bogor41.225.6Ciawi 2 Toll Gate
North-bound only
Sukaraja, Bogor Regency42.226.242Bogor Selatan Toll Gate
  • South Bogor
  • Sukaraja
  • Cibanon
  • Gunung Geulis
  • Summarecon Bogor
South-bound exit & North-bound entry only
44.327.5Ciawi Toll GateSouth-bound only
Ciawi, Bogor Regency46.428.846Puncak RampSouth-bound exit & North-bound entry only
47.029.247Ciawi Ramp
East Bogor, Bogor47.229.3 Bogor–Ciawi–Sukabumi Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Close

Facilities

Rest Area at Km 10, heading to Bogor.

The Jagorawi Toll Road is four lanes wide (in each direction) from Taman Mini to Citeureup, and three lanes wide from Citeureup to Bogor.[9]

The toll road has a Pertamina gas station which is combined with restaurants, rest areas, and outlet stores.[9]

Notable accidents

On 8 September 2013, the toll road has been a nationwide media attention following a fatal accident involving Ahmad Dhani and Maia Estianty's youngest son Abdul Qodir Jaelani. Seven people were killed and 8 people were severely injured in the crash. It was revealed that Abdul lost control of his car and hit the metal separator while traveling home from Bogor to Jakarta, crashing into two oncoming vehicles on the opposite lane.[10]

Floods

For the first time in January 2014, Jagorawi Toll Road was flooded from Cipinang River at KM 4. The toll road was still operational in both directions, with vehicles driving slowly through the flood. Consequently, the toll road suffered from severe gridlock.[11]

Ciawi–Sukabumi Toll Road

Ciawi–Sukabumi Toll Road is a planned 54-km extension of Jagorawi Toll Road, subdivided into 4 sections:[12]

  • Ciawi–Cigombong, 15 km (9.3 mi)
  • Cigombong–Cibadak, 12 km (7.5 mi)
  • Cibadak–West Sukabumi, 14 km (8.7 mi)
  • Cisaat–East Sukabumi, 13 km (8.1 mi)

Concession is held by PT Trans Jabar Toll, a subsidiary of state-owned developer Waskita Karya.[13] Land acquisition by January 2013 was at 40 percent, and Trans Jabar predicted that the construction would begin by the end of 2013. However, construction was delayed due to problems with land acquisition.[14] President Joko Widodo renewed the government's efforts to complete land acquisition in 2016.[15] The Ciawi–Cigombong section was opened in December 2018. Construction on the second section, Cigombong–Cibadak, was 76.50% complete by February 2021; the projected completion date is August 2021.[16]

References

Related Articles

Timelines

Top Qs

Fact Checks