Jinhua–Wenzhou high-speed railway

Railway line in Zhejiang, China From Wikipedia, the free encyclopedia

Jinhua–Wenzhou high-speed railway, also known as Jinhua–Lishui–Wenzhou high-speed railway as well as the Jinhua–Wenzhou railway expansion renovation project, is a high-speed railway operated by China Railway Shanghai Group in Zhejiang province. This line follows a similar route to the conventional Jinhua-Wenzhou Railway but has stations unique to this line. It connects the cities of Jinhua and Wenzhou, via Wuyi County, Yongkang, Jinyun County, Lishui, Qingtian County, Wenzhou's Ouhai and Lucheng District. It then connects the following railways Shanghai–Kunming high-speed railway's Hangzhou–Changsha section and Hangzhou–Fuzhou–Shenzhen high-speed railway's Ningbo–Taizhou–Wenzhou Railway and Wenzhou-Fuzhou Railway sections.

Native name金温新双线
StatusOperational
Quick facts Overview, Native name ...
Jinhua–Wenzhou high-speed railway
A train passes Lishui Daxi River Bridge over Ou River
Overview
Native name金温新双线
StatusOperational
OwnerChina Railway CR Shanghai
LocaleJinhua and Wenzhou,
Zhejiang province
Termini
Service
TypeHigh-speed rail
SystemChina Railway High-speed China Railway High-speed
Services1
OperatorChina Railway CR Shanghai
History
OpenedDecember 26, 2015 (2015-12-26)
Technical
Line length188.366 km (117 mi)
Number of tracks2 (Double-track)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed200 km/h (120 mph)
Route map

Jinhua South
Wuyi North
Yongkang South
Jinyun West
Lishui
Chenzhuan
Qingtian
Wenzhou South
Close

Stations

Design and construction

This project was built as a double tracked electrified railway built to national level I standards. It has a route length of 188.366 km (117 mi) and a design speed of 250 km/h (155 mph) (but limited to 200 km/h (124 mph) operationally). It has a planned passenger transport capacity of 69 train pairs per day, equating to about 15 million passengers per year. A new service depot has also been constructed in Jinhua as part of this project to handle train maintenance.[2][3] It has been built with a total investment of 17.97 billion yuan, as a joint venture between the now defunct Ministry of Railways and the Zhejiang provincial government. The construction period lasted four years, ending on October 15, 2015, when testing was commenced.[4][5][6][7][8] The line was opened on December 26, 2015.[9]