Jixi Pumped Storage Power Station

From Wikipedia, the free encyclopedia

Official name绩溪抽水蓄能电站
CountryChina
LocationJixi County
Coordinates30°09′33″N 118°45′42″E / 30.1593°N 118.7617°E / 30.1593; 118.7617
Jixi Pumped Storage Power Station
Official name绩溪抽水蓄能电站
CountryChina
LocationJixi County
Coordinates30°09′33″N 118°45′42″E / 30.1593°N 118.7617°E / 30.1593; 118.7617
StatusOperational
Construction began2010
Opening date2019-2021
Construction costCNY¥8.2 billion (US$ 1.2 billion)[1]
Upper reservoir
Total capacity10,598,000 m3 (8,592 acre⋅ft)
Lower reservoir
Total capacity10,944,000 m3 (8,872 acre⋅ft)
Power Station
Turbines6 x 300 MW Francis pump turbines
Installed capacity1,800 MW

The Jixi Pumped Storage Power Station (Chinese: 绩溪抽水蓄能电站) is a pumped-storage hydroelectric power station currently under construction in Jixi County, Anhui Province, China. Studies were carried out in 2008 and construction began in December 2010. It is expected to last 6 years.[2][3] As of April 2017 the dam is completed.[4] First turbine was commissioned in December 2019, followed by second in May 2020 and third and fourth in August 2020. The last two units were commissioned in February 2021.[5]