Julong station

Guangzhou Metro Line 8 and Line 12 station From Wikipedia, the free encyclopedia

Julong Station (simplified Chinese: 聚龙站; traditional Chinese: 聚龍站; Jyutping: zeoi6 lung4 zaam6; Cantonese Yale: Jèuhlùhng Jaahm) is an interchange station between Line 8 and Line 12 of the Guangzhou Metro. It is located under the intersection of Xicha Road, Shicha Road and Dekang Road in Guangzhou's Baiyun District. The Line 8 station started operation on 26 November 2020. The Line 12 station started operation on 29 June 2025, becoming an interchange station.[1]

Literal meaninggathering dragons station
Hanyu PinyinJùlóng Zhàn
Quick facts Chinese name, Simplified Chinese ...
Julong

聚龙
Guangzhou Metro
Platform 4 (Line 12 towards Xunfenggang)
Chinese name
Simplified Chinese聚龙站
Traditional Chinese聚龍站
Literal meaninggathering dragons station
Transcriptions
Standard Mandarin
Hanyu PinyinJùlóng Zhàn
Yue: Cantonese
Yale RomanizationJèuhlùhng Jaahm
JyutpingZeoi6lung4 Zaam6
Hong Kong RomanizationTsui Lung station
General information
LocationIntersection of Xicha Road (西槎路), Shicha Road (石槎路) and Dekang Road (德康路)
Border of Tongde Subdistrict and Shijing Subdistricts, Baiyun District, Guangzhou, Guangdong
China
Coordinates23°11′2.2700″N 113°14′0.3998″E
Operated byGuangzhou Metro Co. Ltd.
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code806 1204
History
Opened
  •      Line 8: 26 November 2020
    (5 years ago)
     (2020-11-26)
  •      Line 12: 29 June 2025
    (11 months ago)
     (2025-06-29)
Services
Preceding station Guangzhou Metro Following station
Shitan
towards Jiaoxin
Line 8 Shangbu
towards Wanshengwei
Xizhou
towards Xunfenggang
Line 12
West section
Guangzhou Baiyun Railway Station
Location
Close

Station structure

The station is a three-storey underground station. The ground level is the exit, and it is surrounded by Xicha Road, Shicha Road, Dekang Road and other nearby buildings. The first floor is the concourse, the second floor is the platform for Line 8, and the third floor is the platform for Line 12.

The Line 8 section uses light blue as the main color. Like the stations in the northern extension of Line 8, it is decorated with glass panels. The Line 12 section is decorated with the uniform white of the standard station of Line 12 with a turquoise glass curtain wall.

G - Exits A, B, D, E, G, H
L1
Concourse
Concourse Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
 8  Platforms
Platform 1 arrow for L  8  towards Jiaoxin (Shitan)
Island platform, doors will open on the left (Toilets, Nursery)
Platform 2  8  towards Wanshengwei (Shangbu) arrow for R
M Mezzanine Towards Lines  8  and  12  platforms
L3
 12  Platforms
Platform 4 arrow for L  12  towards Xunfenggang (Xizhou)
Island platform, doors will open on the left (Toilets, Nursery)
Platform 3  12  towards Guangzhou Gymnasium (Guangzhou Baiyun Railway Station) arrow for R

Concourse

The concourse is divided into two parts, Line 8 and Line 12, both on the first underground floor. The concourses are equipped with equipped with electronic ticket vending machines and AI customer service centers as well as 7-Eleven convenience stores and automatic vending machines. In addition, there is an automated external defibrillator next to the station control center near Exit B of Line 8 and near Exit H of Line 12.[2] There are elevators, escalators and stairs in the fare-paid areas of Line 4 and Line 12 for passengers to access the platforms.

Platform and transfer method

The station has an island platform each for Line 8 and Line 12. The Line 8 platform is located under Shicha Road, the Line 12 platform is located under the west side of Xicha Road. The two form a "T" shape, with Line 8 on the top and Line 12 on the bottom. For transfers, there is a nodal transfer mezzanine level between the second and third underground floors, connecting the middle of the Line 8 platform and the east end of the Line 12 platform respectively for passengers to transfer between the two lines. You can also transfer through the concourse.

Both platforms have toilets and a nursery room, of which for Line 8 it is located at the south end of the platform, and for Line 12 it is located at the west end of the platform towards Xunfenggang.[2] In addition, there is a set of dual-storage lines on the north end of the Line 8 platform. This station is used as an intermediate terminus for Line 8, and some trains will turnback using these storage lines.

Entrances/exits

The station has 6 points of entry/exit, of which Exits A, B and D opened with the station's initial opening, Exit E was opened in early 2024, and Exits G and H opened with the west section of Line 12. Exit A is accessible via stairlift, and Exits B and G are accessible via elevators.

History

Reserved Transfer Area to Line 12 (2020)

In the 1997 "Guangzhou City Urban Expressways Traffic Line Network Planning Study (Final Report)", the then Line 4 and Line 6 were set up at the current intersection of Xicha Road and Dekang Road with a two-line transfer station. Eventually, most of the section of Line 4 became part of the current Line 8, and Line 6 was converted into the current Line 12, and the station was also named Julong station. On 2 December 2016, the Guangzhou Civil Affairs Bureau announced the initial names of the northern extension of Line 8, and the station was renamed Dekang station.[3] In 2018, the name of Julong station was restored and confirmed. As for the restoration of the original project name as the official station name, some comments believe that the station is next to Julong Village, and "Julong" has been used by locals for many years, whilst "Dekang" comes from the name of one of the roads at the intersection where the station is located. However, the intersection also connects Xicha Road and Shicha Road, and it seems that the name "Dekang" alone seems to be blindly used.[4]

The roof slab of the Line 8 station was sealed on 28 October 2018.[5] The power transmission was successfully carried out in March 2020,[6] and the "three rights" transfer was completed on 30 September the same year.[7] On 26 November 2020, the station opened with the opening of the northern extension of Line 8.[8]

The Line 12 station completed the "three rights" transfer on 24 April 2025 and opened on 29 June the same year.[1]

Operational incident

During COVID-19 pandemic control rules in 2022, the station was affected by prevention and control measures many times and needed to adjust its services. During the epidemic in April, the station was suspended from 9 to 23 April.[9] During the year-end epidemic, the station was suspended from 21 to 27 November.[10][11]