Wikiwand AI

Jurong Hill MRT station

Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Jurong Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line (JRL) in Boon Lay, Singapore. First announced in May 2018, the station is expected to be completed in 2029 along with Phase 3 of JRL.

Coordinates01°19′07″N 103°42′37″E
SystemFuture Mass Rapid Transit (MRT) station
Quick facts General information, Coordinates ...
Jurong Hill
 JS11 
裕廊山
ஜூரோங் ஹில்
Jurong Hill MRT station site
General information
Coordinates01°19′07″N 103°42′37″E
SystemFuture Mass Rapid Transit (MRT) station
OwnerLand Transport Authority
OperatorSingapore One Rail
Line
Platforms2 (2 side platforms)
Tracks2
ConnectionsBus, Taxi
Construction
Structure type
Elevated
Platform levels
1
ParkingYes
Cycle facilities
Yes
AccessibleYes
Other information
Station codeJRH
History
Opening2029; 3 years' time (2029)
Services
Preceding station Mass Rapid Transit Following station
Tukang Jurong Region Line
Future service
Jurong Pier
Terminus
Location
Jurong Hill is located in Singapore Rail
Jurong Hill
Jurong Hill
Location within Singapore Rail
Close

History

On 9 May 2018, the Land Transport Authority (LTA) announced that Jurong Hill station would be part of the proposed Jurong Region Line (JRL).[1] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to Jurong Pier station from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028.[2] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029.[3]

The contract for the design and construction of the Jurong Hill and Jurong Pier stations and 1.1 km (0.68 miles) of associated viaducts – Contract J112[4] – was awarded to a joint venture between China Civil Engineering Construction Corporation (Singapore Branch) (CCECC) and SCB Building Construction Pte Ltd at S$263 million (US$192.79 million) on 6 April 2021. Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029.[5]

Station details

The station will serve the JRL and will be located between the Tukang and Jurong Pier stations. The official station code will be JS11.[6] The station will span over Jurong Pier Road, at the junction with Bird Park Drive just south of the Ayer Rajah Expressway (AYE) interchange. With four entrances, the station will serve Jurong Hill Park to the west and surrounding industrial developments.[7]

References

Related Articles

Timelines

Top Qs

Fact Checks