KRI Raja Haji Fisabilillah
Indonesian offshore patrol vessel
From Wikipedia, the free encyclopedia
KRI Raja Haji Fisabilillah (391) is the lead ship of Raja Haji Fisabilillah-class offshore patrol vessel to be operated by the Indonesian Navy.
Raja Haji Fisabilillah during its launching ceremony | |
| History | |
|---|---|
| Name | KRI Raja Haji Fisabilillah |
| Namesake | Raja Haji Fisabilillah |
| Builder | Noahtu Shipyard, Bandar Lampung |
| Cost | Rp 1.079 trillion |
| Yard number | 406[1] |
| Laid down | 16 November 2022 |
| Launched | 18 September 2024 |
| Identification |
|
| Status | Sea trials |
| General characteristics | |
| Type | Raja Haji Fisabilillah-class offshore patrol vessel |
| Displacement | |
| Length | 98 m (321 ft 6 in) |
| Beam | 13.5 m (44 ft) (breadth) |
| Height | 6.5 m (21 ft) |
| Draft | 4 m (13 ft) |
| Propulsion | 4 × MAN 16V28/33STC diesel engines, 7,280 kW (9,760 shp) |
| Speed | 28 knots (52 km/h) |
| Boats & landing craft carried | 2 × RHIBs |
| Complement | 70 (+24 extra personnel) |
| Sensors & processing systems | Havelsan Advent CMS |
| Electronic warfare & decoys | |
| Armament |
|
| Aircraft carried | 1 × helicopter |
| Aviation facilities | Flight deck and hangar |
Design
Service history
The ship's contract was awarded on 16 April 2020, with the contract worth Rp 1,079,100,000,000.[4] Its construction began with first steel cutting on 26 August 2021 at the then PT Daya Radar Utama (later renamed to PT Noahtu Shipyard) shipyard in Bandar Lampung, Lampung.[2][5]
The ship's keel was laid on 16 November 2022.[6] The ship experienced delays during its construction, which drew some criticism. Although the ship was planned to be handed over in 2023, the construction progress was only at 35% by March 2023.[4][7]
The patrol vessel was launched on 18 September 2024,[8] and was officially given the name of Raja Haji Fisabilillah two days later on the 20 September.[9] The ship started sea trials in October 2025.[10][11]