Kamitokoro Station

From Wikipedia, the free encyclopedia

Location1-chōme-4 Shimotokorojima, Chūō-ku, Niigata-shi
Niigata-ken 950-0991
Japan
Coordinates37°54′25″N 139°2′43″E / 37.90694°N 139.04528°E / 37.90694; 139.04528
Operated byLogo of the East Japan Railway Company (JR East) JR East
Line Echigo Line
Kamitokoro Station

上所駅
The south side of Kamitokoro Station in March 2025
General information
Location1-chōme-4 Shimotokorojima, Chūō-ku, Niigata-shi
Niigata-ken 950-0991
Japan
Coordinates37°54′25″N 139°2′43″E / 37.90694°N 139.04528°E / 37.90694; 139.04528
Operated byLogo of the East Japan Railway Company (JR East) JR East
Line Echigo Line
Distance82.3 km from Kashiwazaki
Platforms2 side platforms
Tracks2[1]
Construction
AccessibleYes
Other information
StatusUnstaffed
WebsiteOfficial website
History
Opened15 March 2025 (2025-03-15)
Services
Preceding station Logo of the East Japan Railway Company (JR East) JR East Following station
Hakusan
towards Kashiwazaki
Echigo Line Niigata
Terminus
Location
Kamitokoro Station is located in Niigata Prefecture
Kamitokoro Station
Kamitokoro Station
Location within Niigata Prefecture
Kamitokoro Station is located in Japan
Kamitokoro Station
Kamitokoro Station
Kamitokoro Station (Japan)

Kamitokoro Station (上所駅, Kamitokoro-eki) is a railway station on the Echigo Line in Shimotokorojima 1-chome, Chūō-ku, Niigata, Japan.[1] It is operated by East Japan Railway Company (JR East).[2]

In 2017, the Kamitokoro school district community council gathered approximately 17,000 signatures from the local residents to request the establishment of a new station.[3] The Niigata city government allocated a budget for the consideration of the new station establishment in the fiscal year 2018 budget.[4]

In February 2022, JR East and Niigata City agreed to build a station between Hakusan and Niigata on the Echigo Line.[5] On 19 April 2023, the Hokuriku-Shinetsu District Transport Bureau approved the planned establishment of the new station.[6] The new station was planned to open at the end of fiscal 2024.[2]

The station name was announced on 1 June 2023.[2] Construction started later that year.[7] The station opened on 15 March 2025.[8] The establishment was celebrated by the local residents as the first station to open in Niigata prefecture in 4 years since the Echigo Oshiage Hisui Kaigan Station in 2021.

Lines

Kamitokoro Station is served by the Echigo Line, and is located 1.6 kilometres from Hakusan and 1.5 kilometres from Niigata.[9] It is the west side of the Nishi-Kosenkyo overpass of the prefectural road 164, Hakusan station to Meike line.

The location of the tracks around this station was formerly shared by the industrial private lines for the Niigata Central Wholesale Market and the Nippon Light Metal plant until their discontinuation. The space was reused to make the Echigo line a double-track capacity. The additional space was repurposed for the west-bound track as a part of the grade separation improvements of the Echigo line.[10]

Station layout

The station has two opposed side platforms connected by an underpass.[1] The platforms are 125 metres long and can accommodate trains that are at most six cars long.[11][5] In addition, elevators are installed.[5] It has a two-platform and two-track configuration. All local trains on the line stop at the station.[11] It was built to be an unstaffed station.[2]

Platforms

1  Echigo Line for Uchino and Yoshida
2  Echigo Line for Niigata

Surrounding area

References

Related Articles

Wikiwand AI