Kanakadurga Flyover

From Wikipedia, the free encyclopedia

Coordinates16°30′46″N 80°36′14″E / 16.51278°N 80.60389°E / 16.51278; 80.60389
Carries6 lanes of road
Kanakadurga Flyover

కనకదుర్గ వారధి
Coordinates16°30′46″N 80°36′14″E / 16.51278°N 80.60389°E / 16.51278; 80.60389
Carries6 lanes of road
CrossesKrishna River, Prakasam Barrage
LocaleVijayawada
Other name(s)Durga Temple Flyover
Characteristics
DesignBeam bridge
Total length2.6 kilometres (1.6 mi)
Width23.7 metres (78 ft)
No. of spans47
History
Construction start22 November 2015
Construction end30 August 2020
Construction cost₹458 Crores
Opened30 September 2020 (2020-09-30)
Location

The Kanakadurga Flyover (also known as Durga Temple Flyover) is a flyover spanning the Krishna River and Prakasam Barrage in Vijayawada, India. As of 2022, it is the longest flyover in Andhra Pradesh with a length of 2.6 kilometres (1.6 mi). It was opened on 16 October 2020 by Nitin Gadkari.[1]

The Kanakadurga Flyover is built around Indrakeeladri Hill on which Kanaka Durga Temple is located.[citation needed] It spans from Bhavanipuram near Gollapudi to PNBS. Road widening works have been completed up to Kanaka Durga Varadhi. This project has a total length of 5.29 kilometres (3.29 mi), of which 2.3 kilometres (1.4 mi) are flyover and the remaining 2.9 kilometres (1.8 mi) are road widening works. This flyover crosses Krishna River, Prakasam Barrage[2] and Buckingham Canal near Indrakeeladri hill,[3] and meets NH65[4] near PNBS.[5]

History

After bifurcation, a flyover was proposed by the government of Andhra Pradesh to control traffic flow between the new state capital Amaravati and the de facto capital Hyderabad on the existing 15-20 foot highway around Durga temple.[6] The construction of the Kanakadurga Flyover was started by Soma Company of Hyderabad on 22 November 2015 and the road level bridge was completed by 2016 for Krishna Pushkaralu. The flyover was very difficult to construct due to its plan and on the River Krishna.[clarification needed] The land acquisition for this project cost around 100 crores for the shifting of utilities like drinking water pipelines along the road. The construction deadline was extended repeatedly between 2017 and 2020, and construction was finally completed by 30 August 2020.[7]

Construction