Kavşak Bendi Dam

Dam in Kozan/Aladağ From Wikipedia, the free encyclopedia

The Kavşak Bendi Dam is a concrete-face rock-fill dam on the Seyhan River bordering Kozan and Aladağ districts in Adana Province, Turkey. Construction on the dam began in 2008 and the first generator was commissioned in 2013. The two remaining generators were commissioned by April 2014.[2] The primary purpose of the dam is hydroelectric power generation. Water is sent about 2.5 km (1.6 mi) downstream where it meets the power station which contains three 59 MW Francis turbine-generators.[3][4]

OfficialnameKavşak Bendi Barajı ve HES
CountryTurkey
LocationKozan/Aladağ
Coordinates37°33′45.28″N 35°31′45.84″E
Quick facts Official name, Country ...
Kavşak Bendi Dam
Kavşak Bendi Dam is located in Turkey
Kavşak Bendi Dam
Kavşak Bendi Dam
Location within Turkey
Official nameKavşak Bendi Barajı ve HES
CountryTurkey
LocationKozan/Aladağ
Coordinates37°33′45.28″N 35°31′45.84″E
StatusOperational
Construction began2008
Opening date2013
OwnerEnerjisa Power Generation Inc.
Dam and spillways
Type of damEmbankment, concrete-face rock-fill
ImpoundsSeyhan River
Height (foundation)88 m (289 ft)
Height (thalweg)73 m (240 ft)
Length186 m (610 ft)
Elevation at crest323 m (1,060 ft)
Width (crest)8 m (26 ft)
Dam volume1,215,000 m3 (1,589,160 cu yd)
Spillway typeControlled
Spillway capacity5,053 m3/s (178,400 cu ft/s)
Reservoir
CreatesKavşak Bendi Reservoir
Total capacity30,000,000 m3 (24,321 acre⋅ft)
Active capacity7,560,000 m3 (6,129 acre⋅ft)
Catchment area13,200 km2 (5,097 mi2)
Surface area1.42 km2 (1 mi2)
Maximum length11 km (7 mi)
Normal elevation318 m (1,043 ft)
Kavşak Bendi Hydroelectric Station
Coordinates37°32′19.83″N 35°31′29.90″E
Commission date2013-2014
TypeConventional, diversion
Hydraulic head84.81 m (278 ft) (net)
Turbines3 x 59 MW Francis-type
Installed capacity177 MW[1]
Annual generation741 Gwh