Kopili Hydro Electric Project

Hydroelectric power project in Assam, India From Wikipedia, the free encyclopedia

Kopili Hydro Electric Project is a 275 megawatts (369,000 hp), hydroelectric power project on the Kopili river and its tributary, Umrong stream. It is located in Dima Hasao district of Assam state in India.[1] The project is developed and operated by North Eastern Electric Power Corporation Limited. It is an important project since the Indian state of Assam, Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland and Tripura benefit from this project.[citation needed]

Official nameKopili Hydro Electric Project
LocationAssam, India
Coordinates25°31′43″N 92°37′58″E
PurposePower
Quick facts Khandong Dam, Official name ...
Khandong Dam
The Khandong dam
Interactive map of Khandong Dam
Official nameKopili Hydro Electric Project
LocationAssam, India
Coordinates25°31′43″N 92°37′58″E
PurposePower
Opening date1984; 42 years ago (1984)
OwnerGovernment of India
Dam and spillways
Type of damConcrete Gravity
ImpoundsKopili River
Height66 metres (217 ft)
Length243 metres (797 ft)
Spillway capacity15417 m³/s
Reservoir
CreatesKopili Reservoir
Total capacity166800
Surface area13.36 square kilometres (5.16 mi2)
Khandong Power House
Coordinates25°31′01″N 92°39′58″E
OperatorNEEPCO
Commission date8 March 1984
Turbines3×25 MW
Installed capacity75 MW
Annual generation363.9 MU
Website
NEEPCO
Close
Official nameKopili Hydro Electric Project
PurposePower
Openingdate1988; 38 years ago (1988)
Quick facts Umrong Dam, Official name ...
Umrong Dam
View of Umrong Reservoir from Umrangso
Interactive map of Umrong Dam
Official nameKopili Hydro Electric Project
Coordinates25°31′43″N 92°42′45″E
PurposePower
Opening date1988; 38 years ago (1988)
Dam and spillways
Type of damConcrete Gravity
ImpoundsUmrang river
Height30 metres (98 ft)
Length143 metres (469 ft)
Spillway typeOgee Radial
Spillway capacity554.7 m³/s
Reservoir
CreatesUmrong Reservoir
Total capacity175000
Surface area16 square kilometres (6.2 mi2)
Kopili Power House
Coordinates25.586020°N 92.723019°E / 25.586020; 92.723019
OperatorNEEPCO
Commission date4 July 1988; 37 years ago (4 July 1988)
Turbines4×50 MW
Installed capacity200 MW
Close

Overview

The Khandong dam impounds Kopili river and Umrong dam impounds Umrong river creating Kopili reservoir and Umrong reservoir. Kopili reservoir partially falls in Meghalaya state as Kopili river forms geographical boundary between Assam and Meghalaya in this region. Water from Kopili reservoir is fed to Khandong power station, releasing water into Umrong reservoir. Water from Umrong reservoir is diverted via tunnels to Kopili power station on the bank of Kopili river. Tail race waters of Kopili power house are released back into the Kopili river.[1] Although this project is not classified as such, its design is very similar to run-of-the-river power projects.

Power plants

Khandong I & II

The Khandong power house stage-I and stage-II are located between two reservoirs, near Umrong reservoir, in geographical location 25.5168°N 92.6660°E / 25.5168; 92.6660 and Khandong dam is located at 25.5286°N 92.6327°E / 25.5286; 92.6327. Khandong Stage-I powerhouse has 2x25 MW Francis type turbines, generating 50 MW power at peak. It is connected to Kopili reservoir via a 4.5 metres (15 ft) diameter, 2,852 metres (9,357 ft) long concrete-lined head race tunnel. First and second units of stage-I were commissioned on 8 March and 3 May 1984 respectively. Khandong stage II powerhouse is located close to stage-I power station. It has 1x25 MW turbine, connected via a 480 metres (1,570 ft) long water conductor system, which was provisioned for at the time of stage-I construction. Third turbine was commissioned on 26 July 2004.[1][2]

Kopili I & II

The Kopili power house stage-I and stage-II are located on the right bank of Kopili river in geographical location 25.586°N 92.723°E / 25.586; 92.723. The related Umrong dam, completed in 1988, is located at 25.5284°N 92.7126°E / 25.5284; 92.7126. Khandong Stage-I and II powerhouse is installed with 4x50 MW Francis type turbines, generating 200 MW power at peak. It is connected to Umrong reservoir via a 4.6 metres (15 ft) diameter, 5.5 kilometres (3.4 mi) long concrete-lined head race tunnel. The first unit of stage-I was commissioned on 4 July 1988.[2]

Lower Kopili HEP

Because of contamination of Kopili river waters, the prospect of Lower Kopili Hydro Electric Project downstream of Kopili powerhouse has met with hurdles for environmental clearances and financial funding of the project. The 120 MW power project will be funded by the Asian Development Bank.[3][4]

Environment issue

This hydroelectric project has suffered some serious damage due to contamination of Kopili river with acid mine discharge from open cast coal mines and rat hole mining in Meghalaya.[5][6][7]

Incidents

2019

The Hydro project site was submerged and flooded following a pipeline burst on 7 October 2019. 4 people has since been reported missing in the overflowing project site. The burst happened on an old pipe, which was repaired the previous year.[8][9]

2022

Incident at Khandong Power Plant claimed lives of three persons.[10]

Map

About OpenStreetMaps
Maps: terms of use
4km
2.5miles
Umrong Reservoir
Umrong Reservoir
Kopili Reservoir
Kopili Reservoir
Kopili Power House
Kopili P.H.
Umrong Dam
Umrong Dam
Khandong Power House
Khandong P.H.
Khandong Dam
Khandong Dam
Kopili Hydro Electric Project