La Barrancosa Dam
Dam in Puerto Santa Cruz, Santa Cruz Province
From Wikipedia, the free encyclopedia
The Complejo Hidroeléctrico Cóndor Cliff (ex-N.K) y La Barrancosa (ex G.J.C.) Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 115 km (71 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. A consortium led by China's Gezhouba Group was awarded the contract to build the Condor Cliff & La Barrancosa Dam upstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion.[1] The dam is being built by Eling Ingeniería, the successor of Electroingeniería of Osvaldo Acosta and Gerardo Ferreyra.[2] The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 600 MW.[3]
| La Barrancosa Dam | |
|---|---|
| Country | Argentina |
| Location | Puerto Santa Cruz, Santa Cruz Province |
| Coordinates | 50°11′31.76″S 70°7′14.64″W |
| Purpose | Power |
| Status | Under construction |
| Construction began | July 2015 |
| Dam and spillways | |
| Type of dam | Embankment, concrete-face rock-fill |
| Impounds | Santa Cruz River |
| Height | 43.5 m (143 ft) |
| Length | 2,900 m (9,500 ft) |
| Dam volume | 6,900,000 m3 (9,000,000 cu yd) |
| Reservoir | |
| Total capacity | 2,720,000,000 m3 (2,210,000 acre⋅ft) |
| Surface area | 198 km2 (76 mi2) |
| Power Station | |
| Hydraulic head | 34.65 m (113.7 ft) |
| Turbines | 5 x 120 MW Kaplan-type |
| Installed capacity | 600 MW |
| Annual generation | 1,866 GWh (estimate) |
In July 2015 machines arrived in Santa Cruz for the construction of the dams.[4]
In December 2023 construction was stopped awaiting funding from China.[5]El 18 de julio de 2025 se firmó un entendimiento con las empresas y el gobernador Claudio Vidal para reactivar la construcción de una de las represas de Santa Cruz, una obra de casi US$5000 millones. En diciembre del 2025, se efectivizaron la transferencia de 150 millones de dólares a la empresa China Gezhouba Group, un paso clave para poner nuevamente en marcha una de las represas del complejo Hidroeléctrico en el Río Santa Cruz, Cóndor Cliff – La Barrancosa, que se construye sobre el río Santa Cruz, paralizado desde 2023.[6]