Wikiwand AI

Line 11 (Beijing Subway)

Metro line in Beijing, China From Wikipedia, the free encyclopedia

Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shíyī hàoxiàn) is a rapid transit line of the Beijing Subway.[6] The line opened between Jin'anqiao and Xinshougang (Shougang Park) on December 31, 2021,[2] and between Jin'anqiao and Moshikou on December 30, 2023.[7][8] Line 11's color is grapefruit.

Other name(s)M11 (planned name)
Winter Olympic Branch Line (nickname for Phase 1)
StatusOperational
Termini
Stations4
Quick facts Overview, Other name(s) ...
Line 11
Line 11 train leaving Jin'anqiao station
Overview
Other name(s)M11 (planned name)
Winter Olympic Branch Line (nickname for Phase 1)
StatusOperational
Termini
Stations4
Service
TypeRapid transit
SystemBeijing Subway
DepotNone (trains temporary store at zig zag tracks near Xinshougang station)
Rolling stockType A, 4-car / 6-car[1]
History
Opened31 December 2021; 4 years ago (2021-12-31)[2]
Technical
Line length4.2 km (2.6 mi)[3][4]
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Operating speed100 km/h (62 mph)[5]
Route map

Moshikou
Jingmen railway crossing
Jin'anqiao
Beixin'an
Xinshougang (Shougang Park)
extension to Beijing West railway station and Lize Shangwuqu
Close

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Jin'anqiao — Shougang Park 31 December 2021 1.5 km (0.93 mi)[3] 3 Phase 1
Moshikou — Jin'anqiao 30 December 2023 1.4 km (0.87 mi) 1
Close

Stations

Phase 1

All stations are in Shijingshan.

More information Station Name, Connections ...
Station Name Connections Nearby Bus Stops Distance
km[9][10]
English Chinese
Moshikou 模式口 336 358 489 597 932 941 961 972 977 快速直达专线135 0.000 0.000
Jin'anqiao 金安桥  6   S1  325 336 337 358 370 396 472 489 502 892 920 921 929 931 932 941 941快 948 959 961 977 977快 981 BRT4(快速公交4) 快速直达专线135 快速直达专线142 快速直达专线150 M3 M4 M5 M6 M7 M11 M16 M20 M22 专61 专110 专148 专198 1.366 1.366
Beixin'an 北辛安 337 941 959 专61 专152 专198 0.850 2.216
Xinshougang (Shougang Park) 新首钢 1 992 专108 专218 0.689 2.905
Close

Phase 2

  • Under Planning.
  • There are suggestions to add an infill station between Qingta and Lianhua Qiao stations on Phase 2 of Line 11.[11][12] In July 2024, the infill station, Wanfeng Lu, was confirmed in official news.[13]
  • Distance: 18.3 km (11.4 mi), all stations are underground.[14]
  • The planned new depot located in Shijingshan District, with all main buildings are underground. The total construction area is approximately 212,000 square meters, of which approximately 10,000 square meters are overground. The investment is approximately 3.29 billion RMB[14].
More information Station Name, Connections ...
Station Name[15] Connections Nearby Bus Stops Distance
km
English Chinese
Xingcai 型材    
Guoluchang Nanlu 锅炉厂南路    
Yamenkouxi (old)[note 1] 衙门口西(旧)    
Yamenkouxi[16] 衙门口西  1  (Branch) (U/C)[16]    
Yamenkoudong 衙门口东    
Lugu Dajie 鲁谷大街    
Wujiacun 吴家村    
Xiaowayao 小瓦窑    
Qingta 青塔    
Wanfeng Lu 万丰路[13]    
Lianhua Qiao 莲花桥  10     
Beijing West railway station 北京西站  7   9 
China Railway Beijing West railway station BXP
   
Maliandao 马连道    
Lize Shangwuqu 丽泽商务区  14   16 
 Daxing Airport  (U/C)
   
Close
  1. As the interchange station between Line 11 Phase 2 and Line 1 Branch section, which was called Tiyuchang Nanjie (体育场南街), is scheduled to name as Yamenkouxi,[16] the former Yamenkouxi station will adopt another new name which is yet to be announced.

History

Old planning

In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route.[17] After Line 10 Phase II took over the entire ring route, Line 11 was displaced.

In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Shougang (Beijing Capital Steel) complex and intersect with Lines 4 and 16.[18][19]

Phase 1

Construction started on November 13, 2019.[6] The western section (Phase 1) of Line 11 (Moshikou station — Xinshougang station), also known as "Winter Olympic Branch Line", is 4.2 km (2.6 mi) in length with 4 stations.[3][4] It is fully underground.[20][21]

Jin'anqiao, Beixin'an and Xinshougang (Shougang Park) stations opened on December 31, 2021.[22] Moshikou station opened on December 30, 2023.[7]

Phase 2

According to the information released on January 11, 2022, Phase II of Line 11 to Lize Shangwuqu and Yangqiao is included in the "Beijing Rail Transit Phase III Construction Plan".[23] In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) confirmed that it will be 23.8 km (14.8 mi) long with 17 stations.[24]

The section between Lize Shangwuqu and Yangqiao was not approved by the NDRC and removed from the short-term plan in 2023.[25] On 8 July 2024, a tender announcement modified phase 2 of line 11 to be 17.4 km (10.8 mi) with 14 stations.[26] It was announced that Yamenkoudong,[27] Wujiacun,[28] Xiaowayao,[29] Wanfenglu,[30] Lianhuaqiao,[31] Maliandao,[32] Lize Shangwuqu[33] and Tiyuchang Nanjie (now Yamenkouxi)[34] stations will start construction.

References

Related Articles

Timelines

Top Qs

Fact Checks