Line 19 (Shanghai Metro)
Planned metro line in Shanghai, China
From Wikipedia, the free encyclopedia
Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.
| Line 19 | |
|---|---|
| Overview | |
| Other name | M9 (planned name) |
| Native name | 上海地铁19号线 |
| Status | Under construction |
| Locale | Baoshan, Jing'an, Hongkou, Pudong, Xuhui, Minhang Shanghai |
| Termini |
|
| Connecting lines | 2 4 6 7 8 9 10 11 12 13 14 15 18 20 23 |
| Stations | 34 |
| Website | www |
| Service | |
| Type | |
| System | |
| Operator | TBA |
| Depot(s) | Chengjiang Road Depot Tieshan Road Yard |
| Rolling stock | Class A 6-car trains |
| History | |
| Planned opening | May 2028 |
| Technical | |
| Track length | 46.2 km (28.7 mi) |
| Number of tracks | 2 |
| Character | Underground and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead lines (1500 volts) |
| Operating speed | 80 km/h (50 mph) |
The line was announced by the Municipal government in 2016 and is planned to finish construction and open between Baoshan Railway Station and Yierba Jinian Road in May 2028.[1] The south section between Hongjian Road and Shibo Avenue is planned to finish construction in 2028, and the middle section between Shibo Avenue and Yierba Jinian Road in 2031.[2][3][4]
History
On 5 March 2026, the tender for Civil Engineering Section 26 (Tieshan Road Yard) was issued, with a construction period of 792 days.[5]
| Shanghai metro line 19 opening history | ||||||
|---|---|---|---|---|---|---|
| Segment | Commenced | Opened | Length | Station(s) | Name | Investment |
| Baoshan Railway Station - Yierba Jinian Road | 3 Mar 2024 | exp May 2028[1] | 9.2 km (5.7 mi) | 8 | North section | 93.889 billion yuan |
| Shibo Avenue - Hongjian Road | 2028 | 37 km (23.0 mi) | 9 | South section | ||
| Yierba Jinian Road - Shibo Avenue | 2031 | 17 | Middle section | |||
| Houtan | Infill station | 1 | South section | |||
Stations
Service routes
| Shanghai metro line 19 service routes | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
| Routes | Station name[6] | Connections | Distance | Location | Open- ing | |||||
| M | English | Chinese | km | min | ||||||
| Baoshan Railway Station | 宝山站 | 0.0 | 0.0 | 0 | Baoshan | May 2028[1] | ||||
| Tietong Road | 铁通路 | |||||||||
| Tieshan Road | 铁山路 | |||||||||
| Langang Road | 兰岗路 | |||||||||
| Taihe Road | 泰和路 | |||||||||
| South Jiangyang Road | 江杨南路 | 18 | ||||||||
| East Huma Road | 呼玛东路 | |||||||||
| Yierba Jinian Road | 一二八纪念路 | |||||||||
| Hongwan Road | 虹湾路 | Hongkou | 2031 | |||||||
| North Chezhan Road | 车站北路 | |||||||||
| Guangling 4th Road | 广灵四路 | 26 (planned) | ||||||||
| Liangcheng Road | 凉城路 | 20 | ||||||||
| Shanghai International Studies University | 上海外国语大学 | |||||||||
| Tian'ai Road | 甜爱路 | |||||||||
| Hailun Road | 海伦路 | 4 10 | ||||||||
| Zhoujiazui Road | 周家嘴路 | |||||||||
| Tilanqiao | 提篮桥 | 12 | ||||||||
| South Pudong Road | 浦东南路 | 2 14 | Pudong | |||||||
| Shangcheng Road | 商城路 | 9 | ||||||||
| Weifang Road | 潍坊路 | |||||||||
| Tangqiao | 塘桥 | 4 | ||||||||
| Nanmatou Road | 南码头路 | |||||||||
| Huafeng Road | 华丰路 | |||||||||
| China Art Museum South | 中华艺术宫南 | |||||||||
| Shibo Avenue | 世博大道 | 13 | 2028 | |||||||
| Houtan | 后滩 | 7 | 2031 | |||||||
| Dezhou Road | 德州路 | 2028 | ||||||||
| Oriental Sports Center | 东方体育中心 | 6 8 11 | ||||||||
| Lingzhao Xincun | 凌兆新村 | 8 26 (planning) | ||||||||
| South Sanlin | 三林南 | |||||||||
| Huajing Road | 华泾路 | 23 | Xuhui | |||||||
| Jinghong Road | 景洪路 | 15 |
Minhang | |||||||
| Liancao Road | 联曹路 | |||||||||
| Hongjian Road | 虹建路 | 44.5 | ||||||||