Wikiwand AI

Line 1 (Chengdu Tram)

Planned tram line in Chengdu, China From Wikipedia, the free encyclopedia

Chengdu Tram Line 1 is under planning. It was once named Yizhou Avenue Tram, with a total length of 9.62 kilometers and 16 stations. The route is planned to be laid along Yizhou Avenue, starting from Chengdu South railway station and arriving at Huayang Hualong Bridge.[1] At the beginning of 2015, the route of the Yizhou Avenue tram demonstration line (Line 1) was announced. In mid-2015, the official website of Chengdu Metro issued the "Announcement of the General Contracting Bidding for the Survey and Design of the Chengdu Yizhou Avenue Tram Demonstration Line". At the end of 2015, the names and locations of 16 stations on the line were announced.[2] In January 2016, in order to alleviate the traffic pressure in the southern part of Chengdu, the Chengdu Tram Line 1 project announced the suspension of construction.

Native name成都有轨电车蓉1号线
StatusUnder planning
LocaleChengdu
Stations16
Quick facts Chengdu Tram Line 1, Overview ...
Chengdu Tram Line 1
Overview
Native name成都有轨电车蓉1号线
StatusUnder planning
LocaleChengdu
Stations16
Service
TypeTram
Services1
Technical
Line length9.62 km (5.98 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Close

Chengdu Tram Line 1 would start at Chengdu South Railway Station and ends at Huayang, with a total of 16 stations. The total length of the line is 9.62 kilometers, of which the elevated section is 0.91 kilometers and the ground section is 8.71 kilometers.[2]

References

See also

Related Articles

Timelines

Top Qs

Fact Checks