Line 1 (Taiyuan Metro)

Metro line in Taiyuan, Shanxi, China From Wikipedia, the free encyclopedia

The Line 1 of Taiyuan Metro is the second metro line in Taiyuan. The line opened on February 22, 2025.[3]

StatusIn operation
Termini
  • Helongwan
  • Wusu 1Hao/2Hao Hangzhanlou
Stations24
Quick facts Overview, Status ...
Line 1
Overview
StatusIn operation
LocaleTaiyuan, Shanxi Province, China
Termini
  • Helongwan
  • Wusu 1Hao/2Hao Hangzhanlou
Stations24
Service
TypeRapid transit
SystemTaiyuan Metro
Services1
Depot(s)Malianying depot
Xishan parking lot
Daily ridership235,600 (February 22, 2025)[1]
History
Commenced2019
Opened22 February 2025; 16 months ago (2025-02-22)
Technical
Line length28.737[2] km (17.856 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Close

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Helongwan — Wusu 1Hao/2Hao Hangzhanlou February 22, 2025 28.737 km (17.86 mi) 24 Phase 1
Close

Stations

Phase 1 of Line 1 runs from Helongwan in the northwest to Wusu 1Hao/2Hao Hangzhanlou in the southeast and has 24 stations.[2] Phase 2 includes Wusu 3Hao Hangzhanlou station, the station will be constructed together with the terminal 3 of Wusu Airport.[4]

More information Station Name, Connections ...
Station Name Connections Distance
km
District
English Chinese
Helongwan 河龙湾站 Wanbailin
Ximinglu 西铭路站
Xikezhan 西客站 Bus interchange Taiyuan West
Jinyanglu 金阳路站
Yanjiagou (Xiaojingyulu) 闫家沟(小井峪路)站
Xiayuan 下元站
Taiyuanligongdaxue 太原理工大学站
Taoyuanlu 桃园路站 Yingze
Da'nanmen 大南门站  2 
Liunan 柳南站
Wuyiguangchang 五一广场站
Taiyuanzhan Xiguangchang 太原站西广场站 China Railway TYV
Taiyuanzhan Dongguangchang 太原站东广场站
Haojiagou 郝家沟站
Chaoyangjie 朝阳街站
Shuangta 双塔站
Nanshifangjie 南十方街站
Changfengdongjie 长风东街站
Xuefudongjie 学府东街站 Xiaodian
Xutandongjie 许坦东街站
Taiyuannanzhan 太原南站 China Railway TNV
Beiying 北营站
Huangling 黄陵站
Wusu 1Hao/2Hao Hangzhanlou 武宿1号2号航站楼站 Airport interchange TYN
Wusu 3Hao Hangzhanlou 武宿3号航站楼站
Close

Construction

Line 1 began construction in December 2019.

In phase 1, it has a total length of 28.737 km, 24 stations and 2 depots.

The length of phase 2 is 1.85km. It only has 1 station to connect new termianl 3 of Wusu Airport.[5]