Line 21 (Shanghai Metro)
Planned metro line in Shanghai, China
From Wikipedia, the free encyclopedia
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km (17 mi) long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[1]
Other namesLine 24 (between 2014 and 2016)
Native name上海地铁21号线
StatusUnder construction
| Line 21 | |
|---|---|
| Overview | |
| Other names | Line 24 (between 2014 and 2016) |
| Native name | 上海地铁21号线 |
| Status | Under construction |
| Locale | Pudong, Shanghai |
| Termini | |
| Connecting lines | 2 6 9 11 12 13 14 |
| Stations | 23 |
| Website | www |
| Service | |
| Type | |
| System | |
| Operator(s) | Shanghai Maglev Development Co., Ltd. |
| Depot(s) | Liuchen Road Depot |
| Rolling stock | Class A 6-car trains |
| History | |
| Commenced | January 4, 2022 |
| Planned opening | 2027 |
| Technical | |
| Track length | 48 km (30 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead lines (1500 volts) |
| Operating speed | 100 km/h (62 mph) |
The line was announced by the Municipal government in 2016.[2][3] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.
History
| Shanghai metro line 21 opening history | ||||||
|---|---|---|---|---|---|---|
| Segment | Commenced | Opened | Length | Station(s) | Name | Investment |
| Dongjing Road - Chuansha Road | 4 Jan 2022 | exp 2027 | 27.964 km (17.4 mi) | 18 | Phase 1 | 36.956 billion yuan |
| Chuansha Road - Shanghai East Railway Station | end-2023 | 14 km (8.7 mi) | 4 | Phase 1 East extension | ||
| Shanghai East Railway Station - Pudong Airport T3 Terminal | exp 2028 | 2 km (1.2 mi) | 1 | |||
| Dongjing Road - ? | planned | Phase 2 | ||||
Stations
Service routes
| Shanghai metro line 21 service routes | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
| Routes | Station name | Connections | Distance | Location | Open- ing | |||||
| L | R | English | Chinese | km | min | |||||
| ● | ● | Dongjing Road | 东靖路 | 6 | 0.0 | Pudong | Phase I 2027 | |||
| ● | ● | North Yanggao Road | 杨高北路 | 12 | ||||||
| ● | | | Jialin Road | 佳林路 | |||||||
| ● | ● | Jinqiao | 金桥 | 9 | ||||||
| ● | | | Yunqiao Road | 云桥路 | |||||||
| ● | ● | Pudong Football Stadium | 浦东足球场 | 14 | ||||||
| ● | | | Longdong Avenue | 龙东大道 | |||||||
| ● | ● | Guanglan Road | 广兰路 | 2 | ||||||
| ● | | | South Gudong Road | 古桐南路 | |||||||
| ● | | | Zhangheng Road | 张衡路 | |||||||
| ● | ● | Xuelin Road | 学林路 | 13 | ||||||
| ● | | | Boning Road | 博宇路 | |||||||
| ● | | | Kangnan Road | 康南路 | |||||||
| ● | ● | East Kangqiao | 康桥东 | |||||||
| ● | | | South Shenjiang Road | 申江南路 | |||||||
| ● | ● | Disney Resort | 迪士尼 | 11 | ||||||
| ● | | | Tanghuang Road | 唐黄路 | |||||||
| ● | | | Chuansha Road | 川沙路 | 28 | ||||||
| ● | | | Shixin Road | 施新路 | Phase 1 East extension 2027 | ||||||
| ● | | | Wenju Road | 闻居路 | |||||||
| ● | | | Jinwen Road | 金闻路 | |||||||
| ● | ● | Shanghai East railway station | 上海东站 | |||||||
| ● | ● | Pudong Airport Terminal 3 | 浦东机场T3航站楼 | 2 Maglev |
44 | Phase I East extension 2028 | ||||
Important stations
The line will interchange with various lines in Pudong at the following stations: