Wikiwand AI

Line 30 (Chengdu Metro)

Metro line in Chengdu, China From Wikipedia, the free encyclopedia

Line 30 of the Chengdu Metro is a metro line currently in operation in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the Southern Chengdu from East of Terminal 2 of Shuangliu International Airport to Longquanyi Railway Station South, totalling 27.96 km and 24 stations, of which 22 are currently in operation, all underground.[1] Line 30 uses 6-car Type-B rolling stock operating up to 80 km/h.[2] and is served by two depots at Gaobeiba and Hongjiaqiao.[2]

StatusOperational
Termini
Quick facts Chengdu Metro Line 30, Overview ...
Chengdu Metro Line 30
Platform of Fucheng Bridge station, towards East of Terminal 2 of Shuangliu International Airport
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations24[1](22 in operation)
Service
TypeRapid transit
SystemChengdu Metro
OperatorChengdu Metro
Depot(s)Gaobeiba Depot (高碑坝车辆段)
Hongjiaqiao Depot (洪家桥停车场)
History
Opened16 December 2025
Technical
Line length27.96 km (17.4 mi)[1]
Number of tracks2
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead lines, 1,500 V DC
Operating speed80km/h
Close

History

  • On August 21, 2019, Line 30 is approved officially as part of the fourth phase expansion for the Chengdu Metro by the National Development and Reform Commission, confirming it for 2019–2024's subway construction plan.
  • On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[3]
  • In Dec 2022, Phase 1 finished Financial City North's water/cable/pipe reroute, marking station's main structure construction enters next stage.[5]
  • On Dec 22 2022, Phase 1 finished Jiaozi Flyover's structure construction.[6]
  • On 17 Feb 2023, Phase 1 Terminal 2 of Shuangliu International Airport EastSisheng section's left tunnel is finished, marking the completion of the 18th tunnel.[7]
  • On 31 March 2023, Phase 1 's Gaobeiba Depot (高碑坝车辆段) is powered on.[8]
  • On 11 September 2023, Phase 1's longest station - Terminal 2 of Shuangliu International Airport East finished structure construction, marking the 23rd station to finish structure contraction.[9]
  • On 22 September 2023, Phase 1 finished tunnel construction.[10]
  • On 16 December 2025, Phase 1 entered service.[11]

Stations

More information Station number, Station name ...
Station number Station name Transfer Distance
km
Location
English Chinese[12]
3024 East of Terminal 2 of Shuangliu International Airport 双流机场2航站楼东  19 
 10  (OSI via Terminal 2 of Shuangliu International Airport)
China Railway IPW

Chengdu Shuangliu International Airport CTU

0.00 0.00 Shuangliu
3023 Sisheng 寺圣 2.09 2.09
3022 Xingyue 星月 0.81 2.90
3021 Guangming 光明 0.92 3.82
3020 Xiejiadu 谢家渡 1.31 4.13
3019 Zhujiang Road 珠江路  8  0.66 5.79
3018 Datong 大同 1.34 7.13
3017 Shiyangdong[12] 石羊东[12] 1.99 9.12 High-Tech Zone
3016 Xinyuan Avenue 新园大道 0.87 9.99
3015 Chengdu First People's Hospital 市一医院  5  1.15 11.14
3014 Yizhou Avenue 益州大道 0.84 11.98
3013 Financial City North 金融城北 0.86 12.84
3012 Fucheng Bridge 府城桥 0.61 13.44
3011 Jinshi Road 金石路  6  1.25 14.69 Jinjiang
3010 Juanzishu 棬子树 1.59 16.28
3009 Jinyi 锦逸 0.99 17.27
3008 Jiaozi Flyover 娇子立交  13  1.70 18.97
3007 Haitong Street 海桐街 0.90 19.87
3006 Hangtian Flyover 航天立交 1.01 20.87
3005 Huiwangling 惠王陵  2  1.07 21.94 Longquanyi
3004 Yushi 玉石 1.37 23.31
3003 Fenshui 分水 1.09 24.40
3002 Yuhong Road 玉虹路[12]
3001 Longquanyi Railway Station South 龙泉驿火车站南
Close

References

Related Articles

Timelines

Top Qs

Fact Checks