Line 3 (Guiyang Metro)
From Wikipedia, the free encyclopedia
Native name贵阳轨道交通3号线
StatusOperational
| Line 3 | |
|---|---|
| 3 | |
| Overview | |
| Native name | 贵阳轨道交通3号线 |
| Status | Operational |
| Locale | Guiyang, Guizhou Province, China |
| Termini | |
| Stations | 29 |
| Service | |
| Type | Rapid transit |
| System | Guiyang Metro |
| Operator(s) | Guiyang Urban Rail Transit (GYURT) |
| Depot(s) | Dongfengzhen & Huaxinan[1] |
| History | |
| Opened | 16 December 2023 |
| Technical | |
| Line length | 43.03 km (26.74 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1500 V DC with overhead catenary |
| Operating speed | 100 km/h |

Line 3 of the Guiyang Metro (Chinese: 贵阳轨道交通3号线) is a rapid transit line in Guiyang, Guizhou, China. It is 43.03 kilometres (26.74 mi) long and has 29 stations.[1] All stations are located underground.