Line 4 (Foshan Metro)

From Wikipedia, the free encyclopedia

StatusUnder Construction
LocaleFoshan (Nanhai, Sanshui and Chancheng districts)
Guangdong
Termini
Line 4
 4 
Overview
StatusUnder Construction
OwnerFoshan Metro Group
LocaleFoshan (Nanhai, Sanshui and Chancheng districts)
Guangdong
Termini
Stations33
Service
TypeRapid transit
SystemFoshan Metro (FMetro)
Services1
Technical
Line length55.2 km (34.3 mi) (Phase 1)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)
Map of Line 4 drawn to scale.

Line 4 of Foshan Metro (FMetro) (Chinese: 佛山地铁4号线; pinyin: Fóshān Dìtiě Sì Hào Xiàn) is a line under construction in Foshan. The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and 55.2 km (34.3 mi) kilometers of track.[1][2] Construction started on 15 January 2022.[3][4][5]

The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.[6]

Notes

References

Related Articles

Wikiwand AI