Line 5 (Ningbo Rail Transit)

Metro line in Ningbo, China From Wikipedia, the free encyclopedia

Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line in Ningbo. It starts from west Yinzhou District and ends in Luotuo Bridge Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.[1]

StatusOperational
OwnerNingbo
Termini
  • Buzheng
  • Luotuo Bridge
Quick facts Overview, Status ...
Line 5
Train entering the platform of International Convention and Exhibition Center station
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
  • Buzheng
  • Luotuo Bridge
Stations27
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened28 December 2021; 4 years ago (2021-12-28)
Technical
Line length36.6 km (22.74 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map
Close

The construction of the first section started on 28 September 2016.[2] The line uses GoA4 fully automated trains.[3][4] It is 27.9 km (17.3 mi) in length with 22 stations.[5] The line opened on 28 December 2021.[5]

Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction.[6] The rest 3 stations of phase 2 has started construction since 2 December 2019,[7] and will temporary run as a part of line 5. Test run of phase 2 of line 3 started in 1 February 2024.[8]

Route

Phase 1 of Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.[9]

Opening timeline

More information Segment, Commencement ...
Segment Commencement Length Station(s) Name
Buzheng — Xingzhuang Road 28 December 2021 27.6 km (17.15 mi) 22 Phase 1
Xingzhuang Road — Meiyan 28 June 2024[10] 2 Part constructed together with Phase 2 of Line 3
Meiyan — Luotuo Bridge 28 June 2024[10] 3 Phase 2 of Line 3, now temporarily run as a part of Line 5
Close

Stations

More information Station name, Connections ...
Station name Connections Location
English Chinese
Buzheng 布政 Haishu
Zhangjiatan 张家潭
Tongde Road 同德路
Shiqi 石碶  2 
Yadu 雅渡
Miaoyan 庙堰  8  Yinzhou
Zhonggongmiao 钟公庙
Yinzhou Government 鄞州区政府  3 
Qianhu South Road 钱湖南路
South Higher Education Park 南高教园区  4 
Xiaying Road 下应路
Dayangjiang 大洋江
Sigang 泗港
Caoga 曹隘
Liuga 柳隘
Haiyan North Road 海晏北路  1 
Min'an East Road 民安东路  7 
International Convention and Exhibition Center 会展中心
Yuanshi Road 院士路  6 
Angmenggang 盎孟港
Sanguantang 三官堂  2  Jiangbei
Xingzhuang Road 兴庄路 Zhenhai
Xinghai South Road 兴海南路
Meiyan 梅堰  10  Jiangbei
↓ Phase 2 of Line 3, now temporarily run as a part of Line 5
Yongmao Road 永茂路  10  Zhenhai
Zhenhai Avenue (Cihai) 镇海大道(慈海)  7 
Luotuo Bridge 骆驼桥
Close

References

Related Articles

Wikiwand AI