Metro line in Kunming, China From Wikipedia, the free encyclopedia

The Line 6 of the Kunming Metro (Chinese: 昆明轨道交通6号线; pinyin: Kūnmíng Guǐdào Jiāotōng Liù Hào Xiàn) also known as Airport line (Chinese: 机场线; pinyin: Jīchǎng Xiàn) is a rapid transit line that connects the Kunming Changshui International Airport with Kunming's urban center. The line is currently 25.3 kilometres (15.7 mi) in length with 8 stations.

StatusOperational
Termini
  • Tangzixiang
  • Kunming Airport
Stations8
Quick facts Overview, Status ...
Line 6
Line 6 train entering Dabanqiao station
Overview
StatusOperational
LocaleKunming, Yunnan Province, China
Termini
  • Tangzixiang
  • Kunming Airport
Stations8
Service
TypeRapid transit
SystemKunming Metro
Operator(s)Kunming Rail Transit Corp., Ltd
Rolling stockCSR Zhuzhou Type B (6B)
History
Opened28 June 2012; 14 years ago (2012-06-28)
Technical
Line length25.3 km (15.7 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Close

The line entered into operation on 28 June 2012, and ceased operation temporarily beginning May 2016 in order to coordinate work related to the opening of Line 3 scheduled for early 2017. Finally it reopened in August 2017 along with Line 3.

On subway maps, the line's color is   teal.

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
East Coach Station — Kunming Airport 28 June 2012 18.018 km (11.196 mi)[1] 2 Phase 1
East Coach Station — Kunming Airport 5 March 2016 Temporary ceased operation -2 Line 3 & 6 connector project
East Coach Station — Kunming Airport 29 August 2017 Reentered operation 2
Dabanqiao, Airport Front Infill stations 2
Tangzixiang — East Coach Station 23 September 2020[2] 7.3 km (4.5 mi) 4 Phase 2
Close

Hours of Operation

Currently the hours of operation for Line 6, from 6:00 AM to 22:00 PM daily. Frequency averages 15 minutes.

Line 6 trains travels at speeds of up to 100 kilometres per hour (62 mph). On the initial operation one-way trip will take approximately 20 minutes.[3]

Route

Line 6 runs in Panlong District and Guandu District.

Route diagram on Line 6, Kunming Metro
More information station name, Connections ...
station name Connections Distance
km
Location
English Chinese
Tangzixiang 塘子巷  2  0.00 0.00 Panlong/Guandu
Chajie 岔街
Dongjiao Road 东郊路 Guandu
Juhua 菊华  4 
East Coach Station 东部汽车站  3  0.00 0.00 Panlong
Dabanqiao 大板桥 9.73 9.73 Guandu
Airport Front 机场前 5.36 15.09
Kunming Airport 机场中心 Kunming Changshui International Airport KMG 2.09 17.18
Close

History

Construction of Line 6 began on 1 August 2010. Track-laying was completed around December 2011. Line 6 opened to public operation on 28 June 2012 with two initial stations (East Coach Station and Kunming Airport), on the opening day of Kunming Changshui International Airport to serve the passengers from the new airport to downtown Kunming.