Wikiwand AI

Line 7 (Suzhou Metro)

Metro line in Jiangsu, China From Wikipedia, the free encyclopedia

Line 7 of the Suzhou Metro is north-south rapid transit line in Suzhou. Construction started on December 25, 2019. Changlou - Hongzhuang section started operation on December 1, 2024, but the operation of Moyang - Changlou section is postponed due to the construction of Suzhou North railway station.

StatusIn operation
(Moyang to Changlou is postponed, Chunqiulu to Moyang is under construction)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations28
Quick facts Overview, Status ...
Line 7
A line 7 train entering Muli station
Overview
StatusIn operation
(Moyang to Changlou is postponed, Chunqiulu to Moyang is under construction)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations28
Service
TypeRapid transit
SystemSuzhou Metro
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length35.2 km
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Close

The section between Hongzhuang and Muli stations was previously operated as branch line of Line 4.[1] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.

It has Tian'edang Yard (Chinese: 天鹅荡停车场) in use.[2]

Opening timeline

More information Segment, Commencement ...
Segment Commencement Length Station(s) Name
Hongzhuang — Muli 15 April 2017 11.1 km (6.90 mi) 7 Phase 1 south section (taken over from line 4 branch)
Changlou — Hongzhuang 1 December 2024[3] 20 Phase 1 middle section
Moyang — Changlou 2027? 4 Phase 1 north section
Baidang South 1 infill station
Close

Stations

More information Station name, Connections ...
Station name[4] Connections Distance
km
Location Notes
English Chinese
Chunqiulu 春秋路 - 0 Xiangcheng Northern extension. Under construction
Chunguanglu 春光路 -
Yongchanglu 永昌路
Shiganglu 石港路
Moyang 莫阳  4  - Operation postponed
Zhujing 朱泾
Suzhoubei Railway Station 高铁苏州北站  2   10 
Xuenan 雪南
Changlou 常楼
Dengyun 登云
Litanghelu 蠡塘河路
Chunshenhudonglu 春申湖东路
Huayuanlu East 华元路东
Baidang North 白荡北  8 
Baidang South 白荡南
Banjing 板泾 SIP
Yangjing 洋泾
Jicuiqiao 积翠桥
Central Park 中央公园  1 
Reyunqiao 惹云桥  6 
Huangtiandang 黄天荡  5 
Loufeng 娄葑
Qunli 群力
Tongyuanlu South 通园路南  3 
Linjiatan 林家潭 Wuzhong
Guoxiang 郭巷  2 
Yinshan 尹山
Jinjiaqiao South 金家桥南
Fengjinlu 枫津路
Hongzhuang 红庄  4 
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里
Close

Rolling stock

More information Fleet numbers, Year built ...
Fleet numbers Year built Time in service Builder Class Number in service No
of
car
Assembly Rolling stock Number Depots Line assigned Notes
396 (66 sets) 2023-2025 (planned) N/A CRRC Nanjing Puzhen B Never built 6 Tc+Mp+M - M + Mp+Tc PM227 070101-076606
(0701-0766)
None  7  (planned) The order scrapped in February 2023.
300 (50 sets) 2023-2025[a] 2024-present CRRC Nanjing Puzhen B 132 (22 sets) 6 Tc+Mp+M - M + Mp+Tc PM259 070101-075006
(0701-0750)
Tian'Edang Yard
Songling Depot
Yuanhe Yard
 7  Converted from PM101, PM102 and PM116.
Close

References

Related Articles

Timelines

Top Qs

Fact Checks