Line S5 (Chengdu Metro)

From Wikipedia, the free encyclopedia

Line S5 (Chengdu Metro), also known as Chengdu-Meishan Line and shortened as Chengmei Line or Meishan Line, is a metro line in Chengdu, China. The line starts from Honglian Station, Line 19, Tianfu New Area, Chengdu, and ends at Meishan East Railway Station (Metro & National Railway), Dongpo, Meishan. The line is 59 km long, has 5 underground stations and 8 elevated/ground stations. Construction started on Sep 26, 2022, and is expected to open in Dec 2026.

2014

2016

2020

  • August 4: Chengdu and Meishan signed the "Chengmei Municipal Railway Line S5 Co-construction and Co-management Cooperation Agreement," detailing that Line S5 would have a branch line and a main line. The main line would be 50.4 km long (with the Chengdu section being 19.4 km and the Meishan section 31 km), costing 15.6 billion yuan, and the branch line would be 32.8 km, costing 9.7 billion yuan. The whole line was planned to be 83.2 km long and cost 25.3 billion yuan.[4][5]

2021

2022

2023

  • July 7: Station names were posted for the Chengdu section, and the public was invited to give suggestions.[17]
  • August 15: Station names for the Chengdu section were officially announced.[18]

Train

Line S5 will use 4-car Type-A trains, with a standard capacity of 756 passengers. The power system uses 1,500 V DC via overhead lines. The trains operate at 160 km/h max. There are 23 trains and 92 cars.[citation needed]

Stations

Notes

References

Related Articles

Wikiwand AI