Line 2 (Guangzhou Huangpu Tram)

Tram line in Huangpu District, Guangzhou From Wikipedia, the free encyclopedia

Guangzhou Huangpu Tram Line 2 (Chinese: 广州黄埔有轨电车2号线) is a tram line serving the Huangpu District of Guangzhou, operated by Guangzhou Trams. On 20 March 2023, the northern section of the Guangzhou Huangpu Tram Line 2 project (Xiangxue Subway Station - Kaiyuan Road East Station) was put into trial operation.[1] On 20 June 2025, the northern section officially opened for passenger service.[2] It is 14.38 km (8.9 mi) in length with 20 stations,[3] of which currently 8 stations spanning 4.9 km (3.0 mi) are operational.

Map of Guangzhou Huangpu Tram Line 2
Native name广州黄埔有轨电车2号线
OwnerGuangzhou Huangpu Light Rail Line 2 Construction & Investment Co., Ltd.
Termini
Quick facts Guangzhou Huangpu Tram Line 2, Overview ...
Guangzhou Huangpu Tram Line 2
 THP2 
A tram in Kaiyuan Road East station
Overview
Native name广州黄埔有轨电车2号线
OwnerGuangzhou Huangpu Light Rail Line 2 Construction & Investment Co., Ltd.
LocaleHuangpu District, Guangzhou, Guangdong
Termini
Stations8 (in operation)
20 (future)[1]
Service
TypeTram
SystemGuangzhou Trams
Services1
Operator(s)Guangzhou Metro Transit Development Co., Ltd.
Depot(s)Yuangang Depot
Liucun Depot
History
Opened20 June 2025; 14 months ago (2025-06-20)
Technical
Line length4.9 km (3.0 mi)
Number of tracks2
CharacterAt-grade
Track gauge1,435 mm (4 ft 8+12 in)
Close

The northern section of this line (Xiangxue Subway Station – Kaiyuan Road East) completed its pre-operation safety assessment as early as April 2023. However, due to disagreements between the owner and the operator regarding the entrusted operation contract, and the failure to rectify some issues identified in the safety assessment, its opening was delayed until 20 June 2025.[4][5] The remaining southern section is still under construction and will be developed in conjunction with related municipal facilities.[6]

Fares

The line uses fixed independent fare. Single journey costs 2 RMB regardless of the distance.[2]

Stations

More information Station No., Station name ...
Station
No.
Station name Connections Distance
km
Location
English Chinese
THP201 Xiangxue Subway Station 地铁香雪站  THP1  THP101
 6  632
Huangpu
THP202 Huangpu Library 黄埔图书馆
THP203 Xiazhong Road 下中路
THP204 Luofeng 萝峰
THP205 Xiangxue Road East 香雪大道东
THP206 Xiangxue Park 香雪公园
THP207 Yuyan Road 玉岩路
THP208 Kaiyuan Road East 开源大道东
Yunpu 5th Road (U/C) 云埔五路
Liucun (U/C) 刘村
Yunpu 3rd Road (U/C) 云埔三路
Yunpu 1st Road (U/C) 云埔一路
Yuangang (U/C) 元岗
Pubei Road (U/C) 埔北路
Yunpu Industrial Zone (U/C) 云埔工业区
Punan Road (U/C) 埔南路
Yantian (U/C) 严田
Kaichuang Road South (U/C) 开创大道南
Nangangxu (U/C) 南岗圩
Nangang Subway Station 地铁南岗  13  1329
Close

History

Planning

In December 2017, the feasibility study for the line was approved, and preliminary design preparations were subsequently carried out.[7] On 1 July 2019, the environmental impact assessment for the route was released for public comment.[8]

Construction

The groundbreaking ceremony for this line was held on 28 September 2019,[9] and construction officially commenced on 25 December the same year.[10] Construction on the Xiangxue Road section (from Xiangxue Subway Station to Xiangxue Park Station) officially began in April 2020, with track laying commencing in early October the same year.[11] Main construction was completed in late October 2020.[12]

In March 2021, construction officially began on the Yuyan Road section. On 1 July the same year, the tracks for the Xiangxue Road section and the Yuyan Road section (from Xiangxue Subway Station to Yunfeng Road Station) were successfully connected.[13]

On 16 April 2022, the first continuous section of the Huangpu Tram viaduct across the Guangzhou-Shenzhen Expressway was successfully poured.[14]

As of 2026, the main structures of key control points of the southern section of Line 2, such as the elevated bridge across the Guangzhou-Shenzhen Expressway and the newly built bridge across the Nangang River, have been completed. However, construction on some other points is still unable to commence due to the progress of planned municipal engineering projects, with notable sections including the Yuyun Road section at Yunpu 5th Road, the track connection between Punan Road and Kaichuang Road Bridge and the Hongming Road Overpass between Yantian and Kaichuang Road South. Construction on the Nangang section (between Nangang River and Nangang Subway Station) will also have to wait until the old village renovation project in Nangang Community starts.[15]

Operation

On 28 December 2020, the day Line 1 opened to the public, in conjunction with the opening of the 13th Luogang Xiangxue Cultural Tourism Festival, the Jiaotong Investment Group announced that the section of Line 2 from Huangpu Library to Xiangxue Park would be open for trial rides from the following day until 3 January 2021, to facilitate tourists' visits to Xiangxue Park to appreciate plum blossoms.[16][17]

In early March 2023, the northern section completed its initial safety pre-operation assessment. It began trial operation without passengers on the 20th the same month.[18] On 13 April, the Guangzhou Municipal Development and Reform Commission approved the fare scheme for Line 2. On 25 April 2023, the northern section passed the pre-opening safety assessment.[19][20]

The northern section began initial operation on 20 June 2025.[21]