Liouesso Hydroelectric Power Station

Power station in the Republic of the Congo From Wikipedia, the free encyclopedia

The Liouesso Hydroelectric Power Station is a 19.2 megawatts (25,700 hp) hydroelectric power station in the Republic of the Congo. The government-owned power station was commercially commissioned in May 2017. Constructed by the China Gezhouba Group, the renewable energy infrastructure project cost approximately US$110 million to construct.[1]

Coordinates01°26′07″N 16°10′42″E
PurposePower
Quick facts Country, Location ...
Liouesso Hydroelectric Power Station
Liouesso Hydroelectric Power Station is located in Republic of the Congo
Liouesso Hydroelectric Power Station
Liouesso Hydroelectric Power Station
Map of the Republic of the Congo showing the location of Liouesso.
Liouesso Hydroelectric Power Station is located in Africa
Liouesso Hydroelectric Power Station
Liouesso Hydroelectric Power Station
Liouesso Hydroelectric Power Station (Africa)
Liouesso Hydroelectric Power Station is located in Earth
Liouesso Hydroelectric Power Station
Liouesso Hydroelectric Power Station
Liouesso Hydroelectric Power Station (Earth)
CountryRepublic of the Congo
LocationOuesso, Sangha Region
Coordinates01°26′07″N 16°10′42″E
PurposePower
StatusOperational
Construction costUS$110 million
OwnerGovernment of the Republic of the Congo
OperatorEnergaz
Dam and spillways
ImpoundsSangha River
Power Station
Commission date2017
Turbines3 x 6.4 MW
Installed capacity19.2 megawatts (25,700 hp)
Annual generation9 GWh
Close

Location

The power station is located in the town of Ouesso, in Ouesso District, in the Sangha Region of the Republic of the Congo. Ouesso sits on the Sangha River, a tributary of the Congo River, near the international border with Cameroon. This is approximately 829 kilometres (515 mi), by road, north of Brazzaville, the capital and largest city in that country.[2]

The geographical coordinates of Liouesso Hydroelectric Power Station are 1°26'07.0"N, 16°10'42.0"E (Latitude:1.435278; Longitude:16.178333).[3]

History

In 2006, the engineering, procurement and construction (EPC) contract for this power station was awarded to Clackson Power Company of South Africa.[4] Later, the EPC contract was switched to the China Gezhouba Group Company (CGGC). CGGC was able to achieve financial close for this power station, in January 2014.[5] On 30 May 2017, the completed power station was commercially commissioned.[6]

Overview

The power house comprises three Francis type turbines, each rated at 6.4 MW, for capacity generation of 19.2 MW. The energy generated here is distributed to the town of Ouesso and to neighboring villages in Ouesso District, in the Sangha Region.[5]

Construction costs and funding

It has been reported that the construction of this HPP cost about US$110 million.[1] Other reliable references have indicated that the government of the Republic of the Congo invested US$92 million. The table below illustrates the funding sources for the power station.[7]

More information Rank, Name of Financier ...
Sources of Funding for Liouesso Hydroelectric Power Station
RankName of FinancierFunding in USD (Millions)PercentageNotes
1Government of the Republic of the Congo
92.0
83.6
[7]
2Other Financier (s)
18.0
6.4
[7]
Total
110.0
100.00
[1]
Close

Rehabilitation

In May 2022, the government of the Republic of the Congo signed agreements with CGGC and ENERGAZ, a Congolese IPP, to rehabilitate this power station, whose output had drastically reduced and to expand the distribution network of the power plant which is not yet grid-connected.[8][9]