List of offshore wind farms

From Wikipedia, the free encyclopedia

This article lists the largest offshore wind farms that are currently operational rated by nameplate capacity. It also lists the largest offshore wind farms currently under construction, the largest proposed offshore wind farms, and offshore wind farms with notability other than size.

Four offshore wind farms are in the Thames Estuary area: Kentish Flats, Gunfleet Sands, Thanet and London Array. The latter was largest in the world.
Offshore wind farm locations. Locations in gray are under construction.

As of 2022, Hornsea 2 in the United Kingdom is the largest offshore wind farm in the world at 1,386 MW.[1]

Largest operational offshore wind farms

This is a list of offshore wind farms with at least 400 MW nameplate capacity that are currently operational.

More information Wind farm, Location ...
Wind farm Location Coordinates Capacity
(MW)
Turbines
number
Turbines
model
Commissioning
date
Refs
Hornsea Project Two United Kingdom 53°54′36″N 1°33′06″E 1,386 165 Siemens Gamesa 8.0-167 DD 2022 [2][3]
Hornsea Project One United Kingdom 53°53′06″N 1°47′28″E 1,218 174Siemens Gamesa SWT-7.0-154 2019 [4][5]
Seagreen United Kingdom 56°35′17″N 1°44′28″W 1,075 114 MHI Vestas V164-10 MW 2023 [6]
Moray East United Kingdom 58°10′01″N 2°41′55″W 950 100 MHI Vestas V164-9.5 MW 2022 [7]
Greater Changhua (1 & 2A) Taiwan 24.1558°N 119.8694°E / 24.1558; 119.8694 (Greater Changhua 1 & 2A (900 MW)) 900 111 Siemens Gamesa 8.0-167 DD 2024 [8]
Moray West United Kingdom 58°05′38″N 2°59′17″W 882 60 Siemens Gamesa 14-222 DD 2025 [9]
Triton Knoll United Kingdom 53°24′N 0°54′E 857 90 MHI Vestas V164-9.5 MW 2021 [10][11]
Hollandse Kust (Zuid) III & IV Netherlands 52°22′00″N 4°07′00″E 770 70 Siemens Gamesa 11.0-200 DD 2023 [12]
Hollandse Kust (Zuid) I & II Netherlands 52°22′00″N 4°07′00″E 759 69 Siemens Gamesa 11.0-200 DD 2023 [13]
Hollandse Kust Noord Netherlands 52°42′54″N 4°15′04″E 759 69 Siemens Gamesa 11.0-200 DD 2023 [14]
Borssele I & II Netherlands 51°42′N 3°05′E 752 94Siemens Gamesa 8MW 2020 [15][16]
Borssele III & IV Netherlands 51°42′25″N 2°54′45″E 731.5 77MHI Vestas V164-9.5 MW 2021 [17][18]
East Anglia ONE United Kingdom 52°40′N 2°18′E 714 102Siemens Gamesa SWT-7.0-154 2020 [19][20]
Walney Extension United Kingdom 54°02′38″N 3°31′19″W 659 40+47MHI-Vestas 8.25 MW
Siemens Gamesa SWT-7.0-154
2018[21]
Yunlin Taiwan 23.5859°N 120.0300°E / 23.5859; 120.0300 (Yunlin (640 MW)) 640 80 Siemens Gamesa 8.0-167 DD 2025 [22][23][24][25]
London ArrayUnited Kingdom51°38′38″N 01°33′13″E630175Siemens Gamesa SWT-3.6-1202013[26][27][28]
Kriegers Flak Denmark 55°04′N 13°01′E 605 72 Siemens Gamesa SWT-8.4-167 2021 [29][30]
Gemini Wind FarmNetherlands 54°02′10″N 5°57′47″E 600150Siemens Gamesa SWT-4.02017[31][32][33][34]
BeatriceUnited Kingdom 58°08′N 3°04′W 58884Siemens Gamesa SWT-7.0-1542019[35]
Gode Wind (phases 1+2)Germany 54°03′N 7°02′E 58297Siemens Gamesa SWT-6.0-1542017[36][37]
Gwynt y MôrUnited Kingdom 53°27′N 3°35′W 576160Siemens Gamesa SWT-3.6-1072015[38]
Race BankUnited Kingdom 53°16′30″N 0°50′00″E 57391Siemens Gamesa SWT-6.0-1542018[39][40]
Greater GabbardUnited Kingdom 51°53′N 1°56′E 504140Siemens Gamesa SWT-3.6-1072012[41][42][43]
Jiangsu Qidong H1+H2 China 32°7′12″N 122°9′36″E 503 84 Shanghai Electric 2021 [44][45]
CGN Shanwei Jiazi I China 22.6015°N 116.0854°E / 22.6015; 116.0854 (CGN Shanwei Jiazi I (503 MW)) 503 78 MySE6.45-180 2022 [46]
Jieyang Shenquan II China 22.6673°N 116.3162°E / 22.6673; 116.3162 (Jieyang Shenquan II (502 MW)) 502 34+16 Shanghai Electric 2022 [47]
Shandong Bozhong B2 China 38.2739°N 118.9225°E / 38.2739; 118.9225 (Shandong Bozhong B2 (501.5 MW)) 501.5 59 2023 [48]
Shandong Bozhong A China 38.3003°N 118.5405°E / 38.3003; 118.5405 (Shandong Bozhong A (501 MW)) 501 60 CSIC Haizhuang H220-8.35 2022 [49]
Huadian Yangjiang Qingzhou III China 20.9699°N 111.6080°E / 20.9699; 111.6080 (Huadian Yangjiang Qingzhou III (500.6 MW)) 500.6 37+30 MySE6.8-158
MySE8.3-180
2022 [50]
CGN Shanwei Houhu China 22.7152°N 116.0582°E / 22.7152; 116.0582 (CGN Shanwei Houhu (500.5 MW)) 500.5 91 MingYang MySE5.5-155 2021 [51]
Hohe See Germany 54°26′N 6°19′E 497 71Siemens Gamesa SWT-7.0-154 2019 [52]
Saint-Brieuc France 48°51′36″N 2°32′06″W 496 62 Siemens Gamesa SG 8.0-167 DD 2023 [53][54][55]
Saint-Nazaire Offshore Wind Farm France 47°09′38″N 2°37′36″W 480 80 GE Haliade 150-6MW 2022 [56]
Neart na Gaoithe United Kingdom 56°16′04″N 2°19′15″W 450 54 Siemens Gamesa 8.0-167 DD 2025 [57]
Borkum Riffgrund 2 Germany 53°56′49″N 6°29′07″E 450 56MHI Vestas V164-8.0 MW 2019 [58]
Horns Rev 3Denmark 55°41′49″N 7°40′09″E 40749MHI Vestas V164-8.3 MW2019[59]
CGN Shanwei Jiazi II China 22.6209°N 116.1632°E / 22.6209; 116.1632 (CGN Shanwei Jiazi II (403 MW)) 403 62 MySE6.45-180 2022 [46][60]
DudgeonUnited Kingdom 53°14′56″N 1°23′24″E 40267Siemens Gamesa SWT-6.0-1542017[61]
Veja MateGermany 54°N 6°E 40267Siemens Gamesa SWT-6.0-1542017[62][63]
CGN Yangjiang Nanpeng Island China 21.4702°N 112.2545°E / 21.4702; 112.2545 (CGN Yangjiang Nanpeng Island (401.5 MW)) 401.5 73Mingyang MY-5.5 MW 2020 [64][65]
AnholtDenmark 56°36′N 11°13′E 400111Siemens Gamesa SWT-3.6-1202013[66][67][68][69]
BARD Offshore 1Germany 54°21′30″N 5°58′30″E 40080BARD 5.0MW2013[70][71][72]
Global Tech I [de]Germany 54°30′00″N 6°21′30″E 40080Areva Multibrid M5000 5.0MW2015[73]
RampionUnited Kingdom 50°39′53″N 0°16′44″W 400116MHI Vestas V112-3.45 MW2018[74]
Binhai North H2China34°30′00″N 120°20′00″E400100Siemens Gamesa SWT-4.0-1202018[75]
CTGNE Yangjiang Shapa - phase II China 21.3180°N 111.4882°E / 21.3180; 111.4882 (CTGNE Yangjiang Shapa - phase II (400 MW)) 400 62 Mingyang MySE6.45-180 2021 [76][77]
Rudong H6 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [78][76]
Rudong H10 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [79][76]
SPIC Rudong H7 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [80]
SPIC Rudong H4 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [81]
Close

Largest under construction

This is a list of wind farms with a nameplate capacity of more than 400 MW currently under construction.

More information Wind farm, Location ...
Wind farm Location Coordinates Capacity
(MW)
Turbines & model Completion Ownership Refs
Hornsea 3 United Kingdom 53°55′12″N 1°19′48″E 2,900 231 × Siemens Gamesa SG 14-236 DD 2027 Ørsted [82]
Coastal Virginia Offshore Wind United States 36.8878333°N 75.4973333°W / 36.8878333; -75.4973333 2,640 176 × Siemens Gamesa 14-222 DD 2026 Dominion (50%), Stonepeak (50%) [83][84][85][86][87]
Sofia United Kingdom 54°58′46″N 2°13′48″E 1,400 100 × Siemens Gamesa 14 MW 2026 RWE [88]
Dogger Bank A United Kingdom 54°44′56″N 1°55′48″E 1,200 95 × GE Haliade-X 13 MW 2025 SSE (40%), Equinor (40%), Vårgrønn (20%) [89][90]
Dogger Bank B United Kingdom 54°59′12″N 1°39′44″E 1,200 95 × GE Haliade-X 13 MW 2025 SSE (40%), Equinor (40%), Vårgrønn (20%) [89]
Inch Cape United Kingdom 56.4947°N 2.2065°W / 56.4947; -2.2065 (Inch Cape (1080 MW)) 1,080 72 × Vestas V236-15.0 MW 2027 ESB (50%), Red Rock Renewables (50%) [91][92]
He Dreiht Germany 54°21′N 6°12′E 960 64 × Vestas V236-15 MW 2025 EnBW [93]
Borkum Riffgrund 3 Germany 54°02′35″N 6°11′46″E 913 83 × Siemens Gamesa 11.0-200 DD 2025 Ørsted [94]
Vineyard Wind United States 41.03325°N 70.61667°W / 41.03325; -70.61667 (Vineyard Wind (800 MW)) 800 62 × 13.6 MW GE Haliade-X 2024 CIP(50%), Avangrid (50%) [95][96][97][98]
Revolution Wind United States 41.124974°N 71.38818°W / 41.124974; -71.38818 704 64 × Siemens Gamesa 11.0-200 DD 2024 Ørsted (50%), GIP/ Skyborn Renewables (50%) [99][100][101][102][103]
Changfang Taiwan 24.0030°N 120.1388°E / 24.0030; 120.1388 (Changfang 1 & 2 (541.5 MW)) 589 62 × MHI Vestas V174-9.5 MW 2023 [104][105][106]
Guodian Xiangshan 1 phase 2 China 500 41 × 12 MW units 2025 [46][107]
Fécamp France 49°54′15″N 0°13′13″E 497 71 × Siemens Gamesa SWT-7.0-154 2023 EDF, Skyborn Renewables [108][109]
Baltic Eagle Germany 54°49′29″N 13°51′42″E 476 50 × MHI Vestas V174-9.5 MW 2025 Iberdrola [110][111]
Calvados France 49°27′22″N 0°29′53″W 448 64 × Siemens Gamesa SWT-7.0-154 2024 EDF, Skyborn Renewables [112][113]
Close

Largest proposed

The following table lists largest offshore wind farm areas (by nameplate capacity) that are only at a proposal stage, and have achieved at least some of the formal consents required before construction can begin.

More information Wind farm, Location ...
Wind farm Location Coordinates Capacity
(MW)
Projected completion Consents Refs
Chaozhou China 43,300 Projected to start work before 2025. Capacity refers to two projects. [114][115]
Sinan Korea Offshore South Korea 8,200 2030 Project approved in 2021. Estimated cost: €36 billion. [116][117][118]
Berwick Bank United Kingdom 4,100 2027 SSE merged Berwick Bank (2.3GW) and Marr Bank (1.85GW) into single project.[119] Planning application will be sent to Scottish government in Spring 2022. Scottish Government consented project in July 2025.[120] SSE missed AR6 due to consent delays.[121] [122][123][124][125][126]
Ossian United Kingdom 3,600 Consent application for a floating wind farm submitted in July 2024. [127]
East Anglia Hub

(formerly Norfolk Bank)

United Kingdom3,100 2026ScottishPower Renewables merged East Anglia TWO (900 MW), East Anglia THREE (1,400 MW) and East Anglia ONE North (800MW) into single hub.

Anticipated project start in 2022. Project completion anticipated in 2026.

[128][129]
Med WindItaly2,800 2030

Floating offshore wind farm. Scoping procedure completed in 2021. Construction to start in 2025. Expected project completion in 2030.

[130][131]
Hornsea Project Four United Kingdom 2,600 [132]
Southwest OffshoreSouth Korea2,500 Phase 1 (60 MW), Phase 2 (400 MW), Phase 3 (2000 MW)[133][134][135][136]
Hornsea Project Three United Kingdom 2,400 Crown Estate Round 3 [137]
SouthCoast Wind United States 2,400 in two phases TBA BOEM
Wilmington East & Wilmington West Wind Farm United States 2,250 TotalEnergy Renewables USA [138][139]
Formosa IIITaiwan2,000 Undergoing environmental impact assessment and approvals which are expected to be completed between 2021 and 2025.[140]
IJmuiden Ver Alpha Netherlands 2,000 2029 [141]
IJmuiden Ver Beta Netherlands 2,000 2029 [141]
IJmuiden Ver Gamma Netherlands 2,000 [141]
OWF Bałtyk I Poland 1,560 Connection to national grid approved in 2021[142] [143][144]
Atlantic Shores United States 1,510 2028 NJBPU [145][146]
Norfolk Vanguard East United Kingdom 1,400 Planning consent granted on 11 February 2022. Offshore works expected to begin in 2025.

Will use V236-15 MW turbines.

[147][148][149][150][151]
Norfolk Vanguard West United Kingdom 1,400 Will use V236-15 MW turbines

Offshore works are expected to begin in 2025.

[152]
Norfolk Boreas United Kingdom 1,400 Planning Consent Granted on 10 December 2021.

RWE restarted project in December 2023. Offshore works are expected to begin in 2025. Will use V236-15 MW turbines

[153][154][155][150][152]
Dogger Bank C

(formerly Teesside A)

United Kingdom1,200 Offshore export cable installation will commence in Q1 2024; offshore platform installation will commence in Q2, 2024; foundation installation will commence in Q3, 2024; turbine installation will commence in Q2, 2025. First power is anticipated in Q3, 2025 and full power in Q1, 2026.[89]
Rampion 2 United Kingdom 1,200 Concept/early planning. Planning application expected 2022.[156] [157]
Beacon Wind United States 1,230 2028 NYSERDA [158][159][160]
Baltic Power Poland 1,140 2026 23 January 2025: Completion of two offshore substations[161] [162]
Thor Denmark 1,008 2027 [163]
Storgrundet Sweden 1,000 Environmental permit granted in September 2023 to Skyborn Renewables [164][165]
Nordlicht I Germany 980 2027 Vattenfall [166]
Skipjack United States 966 2027 Ørsted [167][168][169]
He Dreiht Germany 960 2025 Aug 28, 2024: All 64 foundations installed [170] [171][172]
Gennaker Germany 927 2026 Skyborn Renewables [173]
Sunrise Wind United States 880 2024 NYSERDA [174][175][176]
Empire Wind United States 40.329226°N 73.507861°W / 40.329226; -73.507861 816 2024 NYSERDA [177][178][179][175][176]
Park City Wind United States 804 2025 Connecticut DEEP [180]
Kitty Hawk Wind United States 800 2026 800 MW in Phase 1, proposed total of 2500 MW BOEM [181][182]
Hollandse Kust (West) VI Netherlands 750 2026 Shell, Eneco [183]
Hollandse Kust (West) VII Netherlands 750 2026 RWE [183]
OWF Bałtyk II Poland 720 2026 Construction anticipated in 2025/2026[184] [143]
OWF Bałtyk III Poland 720 2026 Construction anticipated in 2025/2026[185] [143]
Baltic Sea Energy Island I Lithuania 55.916667°N 20.333333°E / 55.916667; 20.333333 700 2028 Expected to be finished by 2028. Several investors who submitted bids are currently under evaluation by Lithuanian government.[186] [187][188][189]
Baltic Sea Energy Island II Lithuania 700 2030 Expected to be finished by 2030 after first wind park completed [190]
Noirmoutier France 488 2025 Delivery and commissioning expected for 2025. Project will consist of 61 Siemens Gamesa 8.0-167 DD.[191][192] [193][194]
Close

Largest cancelled wind farms

Other notable offshore wind farms

More information Wind farm, Country ...
Wind farm Country Coordinates Year Notability Refs
VindebyDenmark54°58′N 11°08′E1991First offshore wind farm; 11 × Bonus 450 kW. Decommissioned in 2017.[201][202][203][204][205][206][207]
BeatriceUnited Kingdom58°7′48″N 3°4′12″W2007Deepest fixed-foundation at 45-metre water depth. 2 × Senvion 5 MW prototype turbines[208][209][210]
Yttre StengrundSweden56°12′N 16°00′E2001First offshore wind farm to be decommissioned (in November 2015)
Fryslân Netherlands 53°00′00″N 5°16′00″E 2021 Largest freshwater wind farm with a total capacity of 382.7 MW [211][212]
HywindNorway2009First full-scale, deep-water floating turbine: Siemens 2.3 MW turbine in 220 meter-deep water[213][214]
Hywind ScotlandUnited Kingdom57°28′59″N 1°21′00″W2017First full-scale, deep-water floating wind farm, at 30 MW capacity[215]
Hywind Tampen Norway 61°20′02″N 2°15′34″E 2022 Currently the largest deep-water floating wind farm with 88 MW capacity. Built specifically to power offshore oil and gas platforms. [216]