| Name | Type | Location | Capacity (MW) | Area (acres) | Online date | # of panels | Owner | Details | Ref |
| Anclote | NG | Pasco County | 1013 | n/a | 1974 | n/a | Progress | 2-unit natural gas steam | [14] |
| Arvah B. Hopkins | NG | Leon County | 484.5 | n/a | 1971 | n/a | City of Tallahassee | 2-unit fossil steam; natural gas fired combustion turbine; natural gas fired combined cycle; natural gas internal combustion engine | [15] |
| Avon Park | NG | Highlands County | 24 | n/a | 1968 | n/a | Progress | 2-unit combustion turbine | [16] |
| Babcock Ranch | PV | Charlotte County | 75 | 440 | 2016/12 | 343,000 | FPL | 139 MW planned | [17][18] |
| Balm | PV | Hillsborough County | 74.5 | 548 | 2018/09 | 736,226 | TECO | | [19][20] |
| Barefoot Bay | PV | Brevard County | 74.5 | 462 | 2018/03 | ~330,000 | FPL | | [21] |
| Bartow | NG | Franklin County | 1133 | n/a | 2009/06 | n/a | Progress | Combined cycle (4 gas, 1 steam turbine) & 4 combustion turbines | [22] |
| Bayboro |
PE |
Pinellas County |
171 |
n/a |
1973 |
n/a |
Progress Energy |
Four combustion turbine units used during times of peak demand |
[16] |
| Big Bend Power Station | NG | Hillsborough County | 1600 | n/a | 1969 | n/a | TECO | 1-unit NG, 1-unit coal, 2-units retired, 3-unit combustion turbine peaking | [23] |
| Big Bend Solar | PV | Hillsborough County | 20 | 106 | 2017/03 | 202,300 | TECO | | [20][24] |
| Blue Cypress | PV | Indian River County | 74.5 | 432 | 2018/03 | ~330,000 | FPL | | [25] |
| Bonnie Mine | PV | Polk County | 37.5 | 352 | | 349,439 | TECO | | [20][26] |
| Brandy Branch Generating Station | NG | Duval County | 710 | n/a | | n/a | FPL | 170 MW simple-cycle natural gas combustion turbine, 2-on-1 combined cycle unit consisting of two 170 MW natural gas combustion turbines and 200 MW steam turbine-electric generator | [27] |
| C.D. McIntosh Power Plant | NG | Polk County | 360 | n/a | | n/a | FPL | Combined cycle natural gas | [28] |
| C. D. Macintosh Jr. |
PE |
Polk County |
5 |
n/a |
1978/12 |
n/a |
Lakeland Electric |
Fossil fuel-fired boiler and electric turbine-steam generator (Unit 3); a natural gas-fired combined cycle unit (Unit 5) |
[29] |
| Cape Canaveral | NG | Brevard County | 1290 | n/a | | n/a | FPL | Unit 1 (3X1 combined cycle) gas/oil | [30] |
| Citrus Combined Cycle Plant |
NG |
Citrus County |
1640 |
n/a |
|
n/a |
FPL |
820 MW natural gas combined-cycle turbines (2 units) |
[31] |
| Citrus Ridge Solar |
PV |
Orange County |
52 |
270 |
2018 |
500,000 |
Walt Disney World |
Built by Origis Energy for Walt Disney World/Reedy Creek Improvement District, generates enough power for two of the four theme parks at Walt Disney World |
[32][33] |
| Citrus Solar | PV | DeSoto County | 74.5 | 841 | 2016/12 | | FPL | | [34] |
| Coral Farms | PV | Putnam County | 74.5 | 587 | 2018/01 | ~330,000 | FPL | | [35] |
| Crystal River Energy Complex | NG | Citrus County | 1610 | n/a | 1982 | n/a | Progress | 700 MW fossil-fuel fired generators (2 units) | [36][31] |
| Crystal River Nuclear Plant | NU | Citrus County | 860 | n/a | 1978 | n/a | Duke Energy | 700 MW fossil-fuel fired generators (2 units) | |
| DeBary | NG | Volusia County | 237 | n/a | | n/a | Progress | 10-unit combustion turbine | [37] |
| DeBary Plant |
PE |
Volusia County |
322 |
n/a |
1975 |
n/a |
Progress Energy |
10 combustion turbine units used primarily during times of peak demand |
[16] |
| Debary Solar Power Plant |
PV |
Volusia County |
74.5 |
445 |
2020/05 |
300,000 |
Duke Energy |
|
[38][39] |
| Deerhaven Generating Station | NG | Alachua County | 185 | n/a | 1972 | n/a | Gainesville Regional Utilities | Simple-cycle combustion turbine | [40] |
| DeSoto Next Generation Solar Energy Center | PV | DeSoto County | 25 | 235 | 2009/10 | 90,000 | FPL | 300 planned | [41] |
| Echo River Solar | PV | Suwannee County | 74.5 | ~500 | | ~330,000 | FPL | | [42] |
| Field Street |
PE |
Volusia County |
44 |
n/a |
2001 |
n/a |
New Smyrna Beach Utilities Commission |
|
[43] |
| Fort Drum Solar Energy Center | PV | Okeechobee County | 74.5 | 840 | 2021/06 | 309,120 | FPL | | [44][45] |
| Fort Myers Generating | NG | Lee County | 2378 | n/a | | n/a | FPL | Combined cycle (6 x 2) 2 peaking units: 2 gas/oil | [30] |
| Fort Myers Power Plant |
PE |
Lee County |
108 |
n/a |
2003/06 |
n/a |
FPL |
|
[46] |
| George E. Turner Power Plant | NG | Volusia County | 147 | n/a | 1970 | n/a | Progress Energy | Combustion turbine | [16] |
| Grange Hall | PV | Hillsborough County | 61.1 | 447 | | 595,213 | TECO | | [20] |
| Gulf Clean Energy Center |
NG |
Escambia County |
1047 |
n/a |
|
n/a |
FPL |
Natural gas fired combustion turbine; NG gas steam turbine. Formerly Crist. |
[47] |
| Gulf Coast Solar Center I | PV | Valparaiso | 30 | 240 | 2017 | 371,325 | Gulf Power | | [48] |
| Gulf Coast Solar Center II | PV | Navarre | 40 | 336 | 2017 | 472,800 | Gulf Power | | [48] |
| Gulf Coast Solar Center III | PV | Bellview | 50 | 366 | 2017 | 599,775 | Gulf Power | | [48] |
| H.L. Culbreath Bay Side | NG | Hillsborough County | 1854 | n/a | 1999 | n/a | FPL | Natural gas | [49] |
| Hamilton | PV | Jasper, Florida | 74.9 | | 2018/12 | | Duke | | [50] |
| Hammock | PV | Hendry County | 74.5 | 957 | 2018/03 | ~330,000 | FPL | | [51] |
| Hardee Power Station | NG | Pinellas County | 471 | n/a | | n/a | FPL | 2-on-1 combined cycle unit | [52][53] |
| Higgins | NG | Pinellas County | 114 | n/a | 1969 | n/a | Progress | 4-unit combustion turbine | [16] |
| Hillsborough County SW Energy Recovery Facility |
WA |
Hillsborough County |
47 |
n/a |
1984/12 |
n/a |
Hillsborough County |
|
[10][54] |
| Hines Energy Complex | NG | Polk County | 2054 | n/a | 1999 | n/a | Progress | 4-unit combined cycle | [16] |
| Horizon Solar Energy Center | PV | Putnam County | 74.5 | 684 | 2018/01 | ~330,000 | NextEra Energy | | [55] |
| Indian River Power Plant | NG | Brevard County | 290 | n/a | | n/a | FPL | Converted to natural gas, waiting state approval to operate in 2015 | [56] |
| Indian River Solar | PV | Indian River County | 74.5 | 695 | 2018/01 | ~330,000 | FPL | | [57] |
| Intercession City | NG | Osceola County | 534 | n/a | 1974 | n/a | Progress Energy | 14-unit combustion turbine | [16] |
| Intercession City |
PE |
Osceola County |
417 |
n/a |
1993/10 |
n/a |
Duke Energy |
|
[58] |
| Interstate Solar | PV | St. Lucie County | 74.5 | 543 | | ~330,000 | FPL | | [59] |
| J.D. Kennedy Generating Station | NG | Duval County | 357.2 | n/a | 2000/06 | n/a | JEA | 1-unit oil/gas combustion turbine, 3 peaking units | [60] |
| Jacksonville Solar | PV | Duval County | 15 | 100 | 2010 | 200,000 | PSEG Solar Source LLC | | [61] |
| Jim Woodruff Dam | HY | Gadsden County | 43.5 | n/a | 1957 | n/a | USACE-Mobile | Net summer | |
| Lake County Resource Recovery Facility |
WA |
Lake County |
14.5 |
n/a |
1991/03 |
n/a |
Covanta Lake II |
|
[10][62] |
| Lake Hancock | PV | Polk County | 49.6 | 356 | | 467,820 | TECO | | [20][63] |
| Lansing Smith Electric Generating Plant | NG | Bay County | 543 | n/a | | n/a | FPL | 2-on-1 natural gas combined-cycle (1 unit) | [64] |
| Larsen Memorial | NG | Polk County | 124 | n/a | | n/a | FPL | Natural gas, diesel backup | [28][65] |
| Lansing Smith Electric Generating Plant |
PE |
Bay County |
32 |
n/a |
2002/04 |
n/a |
Florida Power & Light |
[66] |
[64] |
| Lauderdale Power Station | NG | Broward County | 1223.6 | n/a | | n/a | FPL | 2 (2x1 combined cycle) with 2 units gas/oil | [30] |
| Lee County Waste-to-Energy Facility |
WA |
Lee County |
57.4 |
n/a |
2001 |
n/a |
Reworld |
Two 600 ton-per-day (TPD) waterwall furnaces and one 636 TPD with Martin® reverse-reciprocating grates and ash handling system |
[67] |
| Lithia | PV | Hillsborough County | 74.5 | 580 | | 742,194 | TECO | | [20] |
| Loggerhead | PV | St. Lucie County | 74.5 | 565 | 2018/03 | ~330,000 | FPL | | [68] |
| Manatee Power Plant | NG | Hillsborough County | 1224 | n/a | | n/a | FPL | 4-on-1 combined-cycle consisting of four 170 MW combustion turbines with 470 MW steam turbine-electric generator | [30][69] |
| Manatee Combined Cycle Power Plant |
PE |
Manatee County |
1618 |
n/a |
2005/06 |
n/a |
FPL |
[70] |
[69] |
| Manatee Solar | PV | Manatee County | 74.5 | 762 | 2016/12 | 338,000 | FPL | | [71] |
| Marathon Generating Plant |
PE |
Monroe County |
11 |
n/a |
|
n/a |
Marathon Petroleum |
|
|
| Martin Next Generation Solar Energy Center | IS | Martin County | 75 | 500 | 2010/12 | 6,864 | FPL | (192,192 mirrors) | [72] |
| Martin Power Plant | NG | Martin County | 2209 | n/a | | n/a | FPL | 500 MW 2-on-1 combined-cycle generators (2 units), 1100 MW 4-on-1 combined-cycle generator |
[30][73] |
| McKay Bay Refuse-to-Energy Project |
WA |
Hillsboro County |
22.5 |
n/a |
1985 |
n/a |
City of Tampa |
|
[10][74] |
| Miami-Dade County Resource Recovery |
WA |
Miami-Dade County |
77 |
n/a |
1978/01 |
n/a |
Miami-Dade County |
|
[10][75] |
| Miami-Dade County Solar | PV | Miami-Dade County | 74.5 | 465 | | ~330,000 | FPL | | [76] |
| Midulla Power Station | NG | Hardee County | 853 | n/a | | n/a | FPL | 2-on-1 combined cycle unit | [77][78] |
| North Broward County Resource Recovery |
WA |
Broward County |
68 |
n/a |
1987/03 |
n/a |
Waste Innovations |
|
[10][79] |
| Northern Preserve Solar | PV | Baker County | 74.5 | 565 | 2020 | 301,948 | FPL | [80] | |
| Northside Generating Station | NG | Duval County | 524 | n/a | | n/a | FPL | 3-unit steam, 4-unit diesel peaking | |
| Northside Generating Station |
PE |
Duval County |
212 |
n/a |
|
n/a |
JEA |
Unit ST3 |
|
| Osprey Energy Center | NG | Polk County | 583 | n/a | | n/a | FPL | 1-unit: combined-cycle | [81] |
| P. L. Bartow Combined Cycle Power Plant |
PE |
Pinellas County |
82 |
n/a |
2009/06 |
n/a |
Duke Energy |
|
[82] |
| Palm Beach Renewable Energy Facility No. 1 |
WA |
Palm Beach County |
62 |
n/a |
1989 |
n/a |
Solid Waste Authority of Palm Beach County |
|
[10][83] |
| Palm Beach Renewable Energy Facility No. 2 |
WA |
Palm Beach County |
95 |
n/a |
2015/07 |
n/a |
Solid Waste Authority of Palm Beach County |
|
[10][84] |
| Pasco County Solid Waste Resource Recovery |
WA |
Pasco County |
49 |
n/a |
1988/08 |
n/a |
Pasco County |
|
[10][85] |
| Payne Creek Generating Station | NG | Hardee County | 350 | n/a | | n/a | FPL | Gas-fired combined cycle | |
| Payne Creek Solar | PV | Polk County | 70.3 | 503 | | 711,012 | TECO | | [20] |
| Pea Ridge | NG | Santa Rosa County | 12 | n/a | | n/a | FPL | 5 MW natural-gas generators (3 units) |
[86][87] |
| Peace Creek | PV | Polk County | 55.4 | 422 | | 467,820 | TECO | | [20] |
| Pinellas County Resource Recovery Facility |
WA |
Pinellas County |
75 |
n/a |
1979/07 |
n/a |
Pinellas County |
|
[10][88] |
| Pioneer Trail | PV | Volusia County | 74.5 | 1,219 | 2019 | ~330,000 | FPL | | [89] |
| Polk Power Plant |
NG |
Polk County |
1281 | n/a | | n/a | FPL | Unit 1 integrated coal gasification combined-cycle, units 2&3 gas/oil combustion turbine, units 4&5 natural gas | [90][91] |
| Polk Power Plant |
PE |
Polk County |
59 |
n/a |
1994 |
n/a |
TECO |
|
[92] |
| Port Everglades | NG | Broward County | 1237 | n/a | | n/a | FPL | 12 unit gas/oil - repowered to 1 3x1 gas/oil unit | [30][93] |
| Rice Creek Solar Energy Center | PV | Putnam County |
75 |
615 |
2025 |
213,000 |
Florida Municipal Power Agency |
Built by Origis Energy |
[94][95] |
| Rio Pinar | NG | Orange County | 12 | n/a | 1970 | n/a | Progress Energy | Oil-fired peaker 1-unit combustion turbine | [16] |
| Riviera |
NG |
Palm Beach County | 1290 | n/a | | n/a | FPL | 1 unit gas/oil (3x1 combined cycle) | [30] |
| S. O. Purdom |
NG |
Volusia County |
226 | n/a | | n/a | FPL | Natural gas fired combined cycle | [96] |
| Sanford | NG | Volusia County | 2352 | n/a | | n/a | FPL | 2 4x1 units gas | [30] |
| Seminole Generating Station | CO | Putnam County | 714 | 2000 | 1984 | n/a | Seminole Electric Cooperative | 1-unit coal-fired steam | [97] |
| Santa Rosa Energy Center | NG | Santa Rosa County | 235.9 | n/a | | n/a | FPL | 1-unit: combined-cycle | [98] |
| South Broward County Resource Recovery |
WA |
Broward County |
66 |
n/a |
1986/06 |
n/a |
Waste Innovations |
|
[99] |
| Space Coast Next Generation Solar Energy Center | PV | Brevard County (Kennedy Space Center) | 10 | 60 | 2010/04 | 35,000 | FPL NASA | | [100] |
| St. Lucie Nuclear Power Plant |
NU |
St. Lucie County |
1968 |
n/a |
1976/12 |
n/a |
FPL |
2 × C-E 2-loop nuclear PWR |
[30] |
| Standby Generation Plant |
NG |
Santa Rosa County |
14 |
n/a |
|
n/a |
FPL |
Natural gas internal combustion engine |
|
| Stanton Energy Center | NG | Orange County | 295 | n/a | | n/a | FPL | Unit A&B combined cycle, units 1&2 coal, 6 MW solar farm | [101][102][103] |
| Stock Island Power Plant |
PE |
Monroe County |
114.5 |
n/a |
|
n/a |
Keys Energy Services |
four combustion turbine, two medium speed diesel and one high speed diesel |
[104] |
| Sub 12 |
NG |
Leon County |
18.6 |
n/a |
|
n/a |
FPL |
Natural gas internal combustion engine |
[105] |
| Sunshine Gateway | PV | Columbia County | 74.5 | 953 | 2019/01 | ~330,000 | FPL | | [106] |
| Suwannee River | NG | Suwannee County | 99 | n/a | 1953 | n/a | Progress Energy | 3-unit combustion turbine | [16] |
| Suwannee Solar Facility | PV | Suwannee County | 8.8 | 70 | 2017/12 | <44,000 | Duke Energy Florida | | [107] |
| Tallahassee Solar Farm 1 | PV | Leon County | 20 | 120 | 2018/01 | ~200,000 | City of Tallahassee | | [108] |
| Tallahassee Solar Farm 2 | PV | Leon County | 42 | 240 | 2020/02 | ~400,000 | City of Tallahassee | | [108] |
| Tiger Bay Cogeneration Facility | NG | Polk County | 200 | n/a | 1999 | n/a | Progress Energy | Combustion turbine, heat recovery steam turbine generator, and steam generation boiler | [109] |
| Tom G. Smith Power Plant | NG | Palm Beach County | 57.5 | n/a | | n/a | FPL | 30 MW combined-cycle generator | [110] |
| Tom G. Smith Power Plant |
PE |
Palm Beach County |
36 |
n/a |
1976 |
n/a |
City of Lake Worth Utilities |
30 MW combined cycle unit (Unit S-5), a 30 MW simple cycle gas turbine, a 26 MW fossil fuel steam generating unit (Unit S-3) |
[111] |
| Treasure Coast Energy Center | NG | St. Lucie County | 318 | n/a | | n/a | FPL | 1-unit natural gas | [112] |
| Turkey Point Gas-fired Plant |
NG |
Miami-Dade County |
1253 |
n/a |
|
n/a |
FPL |
1 combined-cycle gas-fired turbine |
|
| Turkey Point Nuclear Plant |
NU |
Miami-Dade County |
1658 |
n/a |
|
n/a |
FPL |
2 × Westinghouse 3-loop nuclear PWR |
[30][113] |
| University of Florida | NG | Alachua County | 42.5 | n/a | 1994 | n/a | Progress Energy | 1-unit combustion turbine | [16] |
| Vero Beach | NG | Indian River County | 117 | n/a | | n/a | FPL | | |
| West County Energy Center | NG | Palm Beach County | 3756 | n/a | | n/a | FPL | 1250 MW 3-on-1 natural gas-fired combined cycle turbines (3 units) | [30][114] |
| Whistling Duck Solar | PV | Levy County | 74 | | 2025 | | Florida Municipal Power Agency | Built by Origis Energy | [115][116] |
| Wildflower | PV | DeSoto County | 74.5 | 721 | 2018/01 | ~330,000 | FPL | | [117] |
| Winston Power Station |
PE |
Polk County |
50 |
n/a |
2001 |
n/a |
City of Lakeland |
Fuel oil |
[118] |