Wikiwand AI

Llanrwst railway station

Railway station in Conwy, Wales From Wikipedia, the free encyclopedia

Llanrwst railway station is in Denbigh Street near the centre of the market town of Llanrwst, Wales, and close to the local bus termini in Watling Street. It is situated on the Conwy Valley Line from Llandudno Junction to Blaenau Ffestiniog 12 miles (19 km) south of the former and was opened by British Rail in 1989. The town's original station (opened in 1863) 1⁄2 mile (0.80 km) to the north is now called North Llanrwst.

LocationLlanrwst, Conwy
Wales
Coordinates53.139°N 3.795°W / 53.139; -3.795
Quick facts General information, Location ...
Llanrwst
National Rail
Llanrwst railway station in 2024
General information
LocationLlanrwst, Conwy
Wales
Coordinates53.139°N 3.795°W / 53.139; -3.795
Grid referenceSH800616
ManagerTransport for Wales Rail
Platforms1
Other information
Station codeLWR
ClassificationDfT category F2
Passengers
2020/21Decrease 1,028
2021/22Increase 8,550
2022/23Increase 14,620
2023/24Increase 20,896
2024/25Increase 27,604
Location
Notes
Passenger statistics from the Office of Rail and Road
Close

Facilities

The station here is unstaffed and has the same basic amenities seen at others on the line - a waiting shelter, timetable poster boards and digital information screen. Tickets must be bought on the train or prior to travel. Step-free access to the platform is available via a ramp from the main road.[1]

Services

Six trains call each way on Mon-Sat (approximately every three hours), with four trains each way on Sundays.[2] All services from here were suspended following major flood damage to the track and other infrastructure in the area by the River Conwy as a result of Storm Gareth on 16 March 2019. A replacement bus service operated, with repairs expected to take several months to complete.[3] The line reopened northwards to Llandudno on 18 July 2019, ahead of the staging of the National Eisteddfod in the town;[4] the remainder followed from 24 July. Further damage to the line caused by flooding from Storm Ciara forced the closure of the route again on 8 February 2020; following repairs costing £2.2m.[5] The line reopened on 28 September 2020.[6]

More information Preceding station, National Rail ...
Close

References

Further reading

Related Articles

Timelines

Top Qs

Fact Checks