Lower Sre Pok 2 Dam
Dam in Stung Treng, Cambodia
From Wikipedia, the free encyclopedia
The Lower Se San/Sre Pok 2 scheme hydroelectric dam is located in Stung Treng Province, Cambodia on the Tonle Sre Pok some 2 kilometres (1.2 mi) upstream of its confluence with the Se San, and about 37 kilometres (23 mi) upstream of the confluence of the combined Sre Pok, Se San and Se Kong rivers with the Mekong mainstream. The dam was officially opened on December 18, 2018.[4]
| Lower Sre Pok 2 Hydropower Dam | |
|---|---|
| Country | Cambodia |
| Location | Tonle Sre Pok |
| Status | Proposed |
| Opening date | 2018[1] |
| Construction cost | US$338.9 million[2] |
| Owner | EVN |
| Dam and spillways | |
| Type of dam | Run-of-river[3] |
| Impounds | Sre Pok River |
| Height | 25 m (82 ft)[3] |
| Reservoir | |
| Total capacity | 0.42 km3 (340,000 acre⋅ft)[3] |
| Catchment area | 30,620 km2 (11,820 sq mi)[2] |
| Surface area | 120 km2 (46 sq mi)[2][3] |
| Power Station | |
| Installed capacity | 400 MW (540,000 hp)[3] (max. ) |
| Annual generation | 1,174 GWh (4,230 TJ)[3] |