M12 Motorway (Sydney)

Motorway in Sydney, Australia From Wikipedia, the free encyclopedia

The M12 Motorway, initially known as Western Sydney Airport Motorway, is a toll-free east-west motorway in Sydney, Australia, linking the Westlink M7 motorway and The Northern Road, as part of the Western Sydney Infrastructure Plan. The four-lane motorway is 15 kilometres (9.3 mi) long and was built at a cost of $1.75 billion (with both state and federal funding). It is aimed at providing direct access from the M7 Westlink motorway to the new Western Sydney International Airport situated at Badgerys Creek.

Length15 km (9.3 mi)[1]
Opened14 March 2026
Quick facts M12 Motorway New South Wales, General information ...
M12 Motorway

The M12 Motorway March 2026
General information
TypeMotorway
Length15 km (9.3 mi)[1]
Opened14 March 2026
Route number(s) M12[2]
Major junctions
East end
West end
Location(s)
Major suburbs / townsCecil Park, Cecil Hills, Mount Vernon, Kemps Creek, Badgerys Creek, Luddenham
Highway system
Close

The motorway began construction in August 2022 and opened on 14 March 2026, months prior to the Western Sydney Airport opening in late 2026. However, the M7–M12 interchange will open later in the year.

Alignment

The M12 Motorway runs between the Westlink M7 motorway and The Northern Road, including an exit to the access road towards the Western Sydney International Airport. The motorway has four lanes, with provision to be widened to 6 lanes. It is also toll-free.[3]

M12 Overpass Artwork

Elizabeth Drive

Elizabeth Drive, Luddenham, 2014

Elizabeth Drive is a two lane, single carriageway road linking the Hume Highway at Liverpool, with The Northern Road at Luddenham. Prior to the proposal to build the M12, Elizabeth Drive was one of several key thoroughfares in Western Sydney. The M12 motorway was constructed north of Elizabeth Drive and parallel to it.[4]

History

Planning

On 15 April 2014, the federal government announced Badgerys Creek to be the site of Sydney's second airport, later known as the Western Sydney International Airport.[5] To support infrastructure to the new airport, a joint federal-state road investment program known as Western Sydney Infrastructure Plan was also announced, which included a motorway linking the Westlink M7 motorway and The Northern Road to the new airport.[6]

On 17 June 2014, as part of the State Budget, the NSW Government announced a $5.5 billion road package for Western Sydney. It included $6 million for planning the Western Sydney Airport motorway. The Budget was also the first time the name of the motorway was referred to.[7] However, government media and press releases later simply referred to it as M12 Motorway.

The project was granted planning approval in April 2021.[8]

Construction

Prior to the start of construction, it was planned that major construction would commence in 2022 with expected completion prior to the Western Sydney Airport opening in 2026.[9][10][8]

The construction of the motorway was split into three sections. In June 2020, the companies shortlisted to build two of the three sections (central and west sections) were announced:[11]

  • 6-kilometre (3.7 mi) west section including the connection to the airport: Acciona, Fulton Hogan, CPB and Georgiou Group joint venture
  • 7.5-kilometre (4.7 mi) central section from west of South Creek to Duff Road: CPB, Georgiou Group joint venture, and Seymour Whyte

In May 2022, Seymour Whyte and CPB Georgiou Group joint venture were announced as the contractors for the central and west sections respectively.[12] Construction began in August 2022 on the west and central sections.[13][14]

The third section (east section) consisted of an interchange with the M7 motorway. It was to be constructed together with the M7 motorway widening and the connection to Elizabeth Drive, known collectively as the M7–M12 Integration project. In December 2022, John Holland Group was announced as the contractor to design and construct the integration project.[15] Construction began in August to October the following year.[16]

Motorway under construction in 2025

The west and central sections, as well as the connection to Elizabeth Drive in the east section, opened on 14 March 2026. The M7–M12 interchange will open slightly later in mid-2026.[17][18]


Exits and Interchanges

More information LGA, Location ...
LGALocationkm[1]miDestinationsNotes
PenrithLuddenham0.00.0 The Northern Road (A9)   Wallacia, Campbelltown, Penrith, WindsorWestern terminus; at-grade intersection with traffic lights
Badgerys Creek4.52.8Warami Drive, Western Sydney Airport, TO Elizabeth Drive
LiverpoolCecil Hills13.58.4Elizabeth Drive   Luddenham, Cabramatta, LiverpoolExit only
14.08.7Elizabeth Drive   Cabramatta, Liverpool
Wallgrove Road   Horsley Park, Rooty Hill
Westbound entrance from Elizabeth Drive
Southbound entrance from Wallgrove Road
FairfieldLiverpool boundaryAbbotsburyCecil ParkCecil Hills tripoint14.79.1 Westlink M7 (M7)Eastern terminus
Interchange under construction; opening in mid-2026