MRT Line 4 (Dhaka Metro Rail)

Approved mass rapid transit line of Dhaka Metro Rail From Wikipedia, the free encyclopedia

The MRT Line 4 (Bengali: এমআরটি লাইন ৪) of Dhaka Metro Rail is a proposed mass rapid transit line, stretching from Dhaka city's main railway station to the Bandar Upazila. This line is scheduled to be completed by 2030 and will be operated by the Dhaka Mass Transit Company Limited (DMTCL). South Korea has expressed interest to invest in this project.

Native nameম্যাস র‍্যাপিড ট্রানজিট লাইন ৪
StatusProposed
Quick facts Mass Rapid Transit Line 4, Overview ...
Mass Rapid Transit Line 4
Overview
Native nameম্যাস র‍্যাপিড ট্রানজিট লাইন ৪
StatusProposed
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Termini
Stations8
Colour on map     Dark Blue (#003DA5)
Service
TypeRapid transit
SystemDhaka Metro Rail
Operator(s)Dhaka Mass Transit Company Limited
Depot(s)Madanpur, Bandar Upazila
History
Planned openingDecember 2030
Technical
Line length16 kilometres (9.9 mi)
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail and 1,500 V DC overhead catenary
Operating speed100 km/h (62 mph)
Highest elevation13 metres (43 ft)
Route map
Close

History

In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[1] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[2] The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.[3] In 2017, an agreement was signed between the government of Bangladesh and Japan to build MRT Line 4 on a Public Private Partnership (PPP) basis.[4] On 1 October 2019, Selina Hayat Ivy, the mayor of Narayanganj City Corporation submitted a written request to Obaidul Quader, the Road Transport and Bridges minister, to connect Narayanganj with the Dhaka Metro network.[5] Although, there was an existing plan to connect the city with Kamalapur by building MRT Line 4 which was proposed to be an underground line parallel with the Narayanganj–Bahadurabad Ghat line.[6] But due to the ongoing double line construction project to increase the commuter service on the line and the construction of the Dhaka–Jessore line, if MRT Line 4 is constructed there, there will not be enough passengers to make the metro line profitable, Dhaka Mass Transit Company Limited (DMTCL) has revised the alignment and changed the destination of the route to Madanpur.[7] In 2023, the government pulled out of the deal with Japan to build MRT Line 4 due to higher costs.[4] the government decided to request the Department of Economic Relations (ERD) to find donors to fund MRT Line 4.[8] ERD found World Bank, Japan and South Korea as potential donors.[9]

Stations

The MRT Line 4 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the following list of stations is tentative and may be updated in the future.[10]

More information Code, Name ...
Code Name Connections Location Opened
English Bengali
1 Kamalapur কমলাপুর Bus interchange Bus station

Bangladesh Railway  MRT Line 1 
 MRT Line 2 
 MRT Line 6 

Motijheel Thana 2030
2 Sayedabad সায়েদাবাদ Jatrabari Thana
3 Jatrabari যাত্রাবাড়ী
4 Shonir Akhra শনির আখড়া
5 Signboard সাইনবোর্ড  MRT Line 2  Siddhirganj Thana
6 Chittagong Road চট্টগ্রাম রোড
7 Kanchpur কাঁচপুর Sonargaon Upazila
8 Madanpur মদনপুর Bandar Upazila