Wikiwand AI

Marusudar River

River tributary in Jammu and Kashmir From Wikipedia, the free encyclopedia

Marusudar river or Maru Sudar river is the largest river tributary of the Chenab River, beginning at the Nunkun glacier of the Warwan Valley and joining the Chenab at Bhandarkoot in the Kishtwar district. As of 2021, 1000MW Pakal Dul Dam the 800MW Bursar Hydroelectric Project are under construction on this river.

CountryIndia
Flows throughMarwah-Dachhan in Kishtwar district, Jammu and Kashmir
SourceNunkun glacier
Quick facts Location, Country ...
Marusudar
River map of Jammu and Kashmir
Location
CountryIndia
Flows throughMarwah-Dachhan in Kishtwar district, Jammu and Kashmir
Physical characteristics
SourceNunkun glacier
 • locationWarwan Valley, Kishtwar, Jammu and Kashmir, India
 • coordinates33°27′25.77″N 75°48′48.99″E
MouthChenab river
 • location
Bhandarkoot, Kishtwar district, Jammu and Kashmir
Length133 km (83 mi) approx.
Basin features
Dams
Pakal Dul Dam, Bursar Dam
Close

Course

The Marusudar river originates from the Nunkun glacier of the Warwan Valley of the Kishtwar district and joins the Chenab river at Bhandarkoot, Kishtwar. It is 133 kilometres (83 mi) long and the largest river tributary to the Chenab river.[1]

Dams

This river has the following dams

  • Pakal Dul Dam, 1000 W, 109 MCM, near Drangdhuran village in Kishtwar district of the Indian Jammu and Kashmir, upstream of Bursar Hydroelectric Power Project.[2]
  • Bursar Hydroelectric Power Project, 800 MW, 618 MCM, near Pakal village in the Kishtwar district, proposed stalled project was expedited in April 2025 after the termination of IWT.[3] In 2017, the proposal was granted the environmental approval by MoEF,[4] after considering locals concerns,[5] who cited the Environmental Impact Assessment (EIA) that the Bursar Dam project will affect 18 hamlets, 17,000 people, 1150 ha of forest clearing, fish migration.[4]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks