Wikiwand AI

Medvode Hydroelectric Power Plant

Run-of-the-river hydroelectricity in Slovenia From Wikipedia, the free encyclopedia

The Medvode Hydroelectric Power Plant (also Medvode HPP, Slovene: Hidroelektrarna Medvode) is a run-of-the-river hydroelectricity in Slovenia. The ROR is located on the Sava River in Medvode.[1][2]

The hydroelectric plant was built in part using forced labor by Catholic priests held as political prisoners after the Second World War.[3] The Medvode Hydroelectric Power Plant is operated by Ljubljana Sava Hydroelectric Plants (Slovene: Savske elektrarne Ljubljana, SEL).[1][4]

Medvode Hydroelectric Power Plant in 2018

See also

References

Related Articles

Timelines

Top Qs

Fact Checks