Meidi Dadao station
Guangzhou Metro Line 7 terminus station
From Wikipedia, the free encyclopedia
Meidi Dadao Station (Chinese: 美的大道站; pinyin: Měidì Dàdào Zhàn; lit. 'Midea Avenue Station') is a station on Line 7 of Guangzhou Metro, located underground on the intersection of Yifeng Road and Midea Avenue in Foshan's Shunde District.[1] The station was opened on 1 May 2022, with the opening of the western extension of Line 7,[2][3] and is the southwestern terminus of the line.
Platform 1 (originating platform) | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 美的大道站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Intersection of Yifeng Road (益丰路) and Midea Avenue (美的大道), Beijiao Subdistrict, Shunde District, Foshan, Guangdong China | ||||||||||||
| Coordinates | 22°56′51.47″N 113°12′8.60″E | ||||||||||||
| Operator | Guangzhou Metro Group | ||||||||||||
| Line | Line 7 | ||||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | 701-8 | ||||||||||||
| History | |||||||||||||
| Opened | 1 May 2022 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
The rails for the station connect to the nearby Yifeng Stabling Yard.[4]

Station layout
| G | Street level | Exits A, B, C, D |
| L1 Concourse & Platforms |
North Lobby | Ticket Machines, Customer Service, Police Station, Security Facilities |
| Side platform, doors will open on the right for alighting passengers only (Toilets, Nursery) | ||
| Platform 2 | ||
| Platform 1 | ||
| Side platform, doors will open on the right for boarding passengers only (Toilets, Nursery) | ||
| South Lobby | Ticket Machines, Customer Service, Police Station, Security Facilities | |
| L2 Mezzanine |
Connecting passageways | Non-paid connecting passage between both sides of the concourses, paid connecting passage between both sides of the platforms |
Entrances/exits
Meidi Dadao has 4 points of entry/exit, split between Exits A and D located at the west concourse and Exits B and C located at the east concourse. Exit C is equipped with an elevator.[1]
- Entrance A
- Entrance B
- Entrance C
- Entrance D
History
During early planning, the planned terminus of Guangzhou Metro Line 7 westward to Beijiao in Shunde was originally planned to be located at Beijiao New Town station (now Beijiao Park), where it intersected with Foshan Metro Line 3. However, in later planning, it was determined that a stabling yard would be added to the western extension, and this station would be added at the same time, so this station became the official western terminus of Guangzhou Metro Line 7.
The station site began enclosure construction on 22 May 2017.[5] On 10 January 2020, the main structure topped out.[4] The station completed the "three rights" transfer on 21 October 2021, making it one of the first stations on the western extension of the line to do so.[6]
It opened on 1 May 2022 with the western extension of Line 7.[2]
During COVID-19 pandemic control rules at the end of 2022, due to the impact of prevention and control measures, station service was suspended from 28 to the afternoon of 30 November 2022.[7][8]
