Merritt 7 station

Metro-North Railroad station in Connecticut From Wikipedia, the free encyclopedia

Merritt 7 station is a commuter rail stop on the Danbury Branch of the Metro-North Railroad's New Haven Line, located in Norwalk, Connecticut. Merritt 7 is named after an adjacent business park based near the interchange of the Merritt Parkway and Route 7.

LocationGlover Avenue
Norwalk, Connecticut
Coordinates41.14803°N 73.42768°W / 41.14803; -73.42768
Operated byConnecticut Department of Transportation[1]
Quick facts General information, Location ...
Merritt 7
View of the new platform opened in June 2023
General information
LocationGlover Avenue
Norwalk, Connecticut
Coordinates41.14803°N 73.42768°W / 41.14803; -73.42768
Owned byConnecticut Department of Transportation[1]
Operated byConnecticut Department of Transportation[1]
Platforms1 side platform
Tracks1
ConnectionsBus transport Norwalk Transit District: Route 7 Link
Construction
Parking105 spaces[2]
AccessibleYes
Other information
Fare zone41
History
OpenedJuly 29, 1985[3]
RebuiltSeptember 2020–June 7, 2023
Passengers
2018181 daily boardings[4]
Services
Preceding station Metro-North Railroad Following station
South Norwalk
Terminus
Danbury Branch Wilton
toward Danbury
South Norwalk
weekday service
Location
Close

History

The new Merritt 7 station under construction in March 2021.

The Merritt 7 corporate park built the station while separating the station from building entrances by a fence to make the complex transit adjacent but not transit-oriented.[5] The station was opened on July 29, 1985, by Metro-North. At the time of its opening, it was the only privately built rail station in Connecticut. Construction of the station cost $750,000.[3]

The station was rebuilt with a 510-foot (160 m) six-car-long high-level platform on the west side of the tracks, slightly north of the former station. The new station has a full-length canopy and an accessible pedestrian overpass with elevators.[6] The state authorized funding for the project in 2017.[7] Bidding took place in April–June 2020; construction began that September.[8][7] The new platform opened on June 7, 2023, but the opening of the footbridge over the tracks to the office park was delayed due to supply chain issues with glass panels,[9] which opened on January 12, 2024.[10]

Station layout

The station has one high-level 6-car long side platform to the west of the single track. It is owned and operated by the Connecticut Department of Transportation (ConnDOT). The station also has 105 free public parking spaces and two EV charging stations, all of which are managed by the state.

References

Related Articles

Wikiwand AI