MetroCentro (Seville)

From Wikipedia, the free encyclopedia

LocaleSeville, Spain
Transit typeTram
Number of lines1
Number of stations8 (2 more planned)
MetroCentro
The tram passing down Avenida de la Constitución
The tram passing down Avenida de la Constitución
Overview
LocaleSeville, Spain
Transit typeTram
Number of lines1
Number of stations8 (2 more planned)
Annual ridership2.91 million (2023)
Websitehttp://www.tussam.es/
Operation
Began operation28 October 2007[1]
Operator(s)TUSSAM
CharacterAt grade, street running
Number of vehicles6 CAF Urbos 3 trams
Technical
System length3.5 km (2.2 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Average speed10 km/h (6.2 mph)
System map

Plaza Nueva
Archivo de Indias
Puerta Jerez
Prado de San Sebastian
San Bernardo
San Francisco Javier
Eduardo Dato
Luis de Morales
MetroCentro tram in Plaza Nueva

Metrocentro, popularly known as Tranvía de Sevilla (Spanish for Seville Tram), is a tram system serving the centre of the city Seville, in Andalusia, Spain. It began operating in October 2007.[1] The tram system only has one line, called T1. It is operated by TUSSAM, which is a municipally owned corporation.

The tram has connections with the Seville Metro and Cercanías Sevilla (commuter rail).

As of 2024, the service consists of eight stops: Plaza Nueva, Archivo de Indias, Puerta de Jerez, Prado de San Sebastián, San Bernardo, San Francisco Javier, Eduardo Dato and Luis de Morales. The service is expected to be extended to Santa Justa AVE station, including two new stops: Kansas City and Santa Justa.

The project works began in mid-2005 and its first phase was completed by autumn 2007. It covered 1.4 km and is served by four CAF Urbos trams.

History

A tram passing the Cathedral in 2014
An Urbos 3 tram recharging its supercapacitors at the Puerta de Jerez station

Seville had already built a long tram system in 1887, but it was dismantled in the 1960s due to financial problems and safety reasons.

The current tram system was planned in 2004, when Seville City Council announced that it would pedestrianize the city center to reduce high pollution, increase pedestrian spaces and promote sustainable mobility in the area. These plans met with the opposition of drivers and merchants, so the City Council decided to create a new tram system, with works starting in 2006.

The tram was to be inaugurated on 24 September 2007. However, due to safety reasons, this event was delayed to 28 October. The tram originally covered the route between Plaza Nueva and Prado de San Sebastián.

On 15 April 2011, the tram was expanded to San Bernardo.

From the start it was envisaged that part of the Metrocentro system should be able to run free from using the overhead contact wire for power. The city had initially forecast that the catenaries would be removed from the area surrounding the cathedral by 2008. On several occasions, the City Council had to dismantle the overhead wires to allow, at Easter, processions to pass without restriction; the builder of the rolling stock paid the extra cost for this. These catenaries were finally removed in late 2014.

Initially, the system operated using the vehicles of the Seville Metro, which did not start operating until 2009.[1] The final system, which is in use since the Holy Week 2011, uses a technology called ACR (Acumulador de Carga Rápida), which are fast charging batteries that were developed and patented by CAF.[2] [3]

Expansion plans

See also

References

Related Articles