Eje Central metro station
Mexico City metro station
From Wikipedia, the free encyclopedia
Eje Central is a station on Line 12 of the Mexico City Metro.[4] The station is located between Parque de los Venados and Ermita. It was opened on 30 October 2012 as a part of the first stretch of Line 12 between Mixcoac and Tláhuac.[4]
Platforms | |||||||||||
| General information | |||||||||||
| Coordinates | 19.361351°N 99.151416°W | ||||||||||
| System | Mexico City Metro | ||||||||||
| Operator | Sistema de Transporte Colectivo (STC) | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Accessible | Yes[1] | ||||||||||
| Other information | |||||||||||
| Status | In service | ||||||||||
| History | |||||||||||
| Opened | 30 October 2012 | ||||||||||
| Key dates | |||||||||||
| 3 May 2021 | Temporarily closed | ||||||||||
| 15 January 2023 | Reopened[2] | ||||||||||
| Passengers | |||||||||||
| 2025 | 3,867,359[3][a] | ||||||||||
| Rank | 134/195[3][a] | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
| |||||||||||
Name and pictogram
The station receives its name due to being located at the intersection between Eje Central (Lázaro Cardenas) and Avenida Popocatépetl. The station's pictogram shows the outline of a Mexico City trolleybus, since Line 1 of Mexico City trolleybus service (also known as the Zero Emissions Corridor) runs all the way on the Eje Central.[5]
General information
The station is located south of the city center in the Portales Sur neighborhood in the Benito Juárez borough and it is built underground.[6]
From 23 April to 22 June 2020, the station was temporarily closed due to the COVID-19 pandemic in Mexico.[7][8]
Ridership
| Annual passenger ridership[a] | |||||
|---|---|---|---|---|---|
| Year | Ridership | Average daily | Rank | % change | Ref. |
| 2025 | 3,867,359 | 10,595 | 134/195 | +4.43% | [3] |
| 2024 | 3,703,377 | 10,118 | 131/195 | +40.90% | [3] |
| 2023 | 2,628,353 | 7,200 | 137/195 | NA | [3] |
| 2022 | 0 | 0 | 176/195 | −100.00% | [3] |
| 2021 | 664,899 | 1,821 | 187/195 | −67.97% | [9] |
| 2020 | 2,075,787 | 5,671 | 153/195 | −49.09% | [10] |
| 2019 | 4,077,416 | 11,171 | 147/195 | +6.57% | [11] |
| 2018 | 3,826,126 | 10,482 | 151/195 | +9.52% | [12] |
| 2017 | 3,493,383 | 9,570 | 155/195 | +4.87% | [13] |
| 2016 | 3,331,007 | 9,101 | 154/195 | +37.78% | [14] |
Notes
- The data here is limited to the most recent ten years to avoid excessive listings; earlier figures can be found in this page's history or on the Mexico City Metro website. To calculate the average daily ridership, the annual total is divided by 365 days (366 in leap years), with decimals omitted from the result. Each station per line is ranked individually, as the system counts transfer stations separately. The percentage change is calculated automatically using the data from the current year and the previous year.
