Mexico City Metro Line 1

Metro line in Mexico City From Wikipedia, the free encyclopedia

Mexico City Metro Line 1 is one of the twelve Metro lines operating in Mexico City, Mexico. Officially inaugurated in 1969, it was the first metro line to be built in the country. Its identifying color is pink, and it runs west–east.

Termini
Stations20
Quick facts Line 1, Overview ...
Line 1
Overview
LocaleMexico City
Termini
Connecting lines
Stations20
Websitemetro.cdmx.gob.mx
Service
TypeRapid transit
SystemMexico City Metro
OperatorSistema de Transporte Colectivo (STC)
Rolling stockNM-16, NM-22
Ridership67,799,070 (2024)[1]
History
Opened4 September 1969; 56 years ago (1969-09-04)
Last extension1984
Technical
Line length16.654 km (10.3 mi)[2]
Track length18.828 km (11.7 mi)[2]
Number of tracks2
CharacterUnderground and at-grade[2]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge with roll ways along track
ElectrificationGuide bar, 750 V DC
Operating speed80 km/h (50 mph) (max.)
36 km/h (22 mph) (avg.)
Route map
Line 1 route highlighted in gray
Observatorio yard
Observatorio
Mexico City Metro Line 12
Tacubaya
Mexico City Metro Line 7 Mexico City Metro Line 9
Juanacatlán
Chapultepec
Sevilla
Insurgentes
Cuauhtémoc
Balderas
Mexico City Metro Line 3
Salto del Agua
Mexico City Metro Line 8
Isabel la Católica
Pino Suárez
Mexico City Metro Line 2
Merced
Candelaria
Mexico City Metro Line 4
San Lázaro
Mexico City Metro Line B
Moctezuma
Balbuena
Boulevard Puerto Aéreo
Gómez Farías
Zaragoza
Zaragoza workshops
Pantitlán
Mexico City Metro Line 5 Mexico City Metro Line 9 Mexico City Metro Line A
Mexico City Metro Line 1 map
Pictograms of Line 1 of the Mexico City Metro
Close

The line is built under several avenues: Parque Lira, Pedro Antonio de los Santos, Circuito Interior, Avenida de los Insurgentes, Avenida Chapultepec, Arcos de Belén, Balderas, Eje Central Lázaro Cárdenas, José María Izazaga, Isabel la Católica, Anillo de Circunvalación, Congreso de la Unión, Eduardo Molina, and Ignacio Zaragoza.

It connects with Lines 7 and 9 at the Station Tacubaya, Line 3 at Balderas, Line 8 at Salto del Agua, Line 2 at Pino Suárez, Line 4 at Candelaria, Line B at San Lázaro and Lines 5, 9 and A at Pantitlán. When Line 12 extension is completed, it will also connect with Line 12 at Observatorio.[3]

History

refer to adjacent text
Chapultepec station during the first day of operations after the inauguration.

The first section of Line 1 was opened on 4 September 1969 as part of Mexico City Metro's first construction stage, it was inaugurated by Gustavo Díaz Ordaz, President of Mexico from 1964 to 1970, and Alfonso Corona del Rosal, Regent of the Federal District Department.[4] The inauguration ceremony took place at the Insurgentes station.[5]

The next day the line was opened to the public. To the original route (ChapultepecZaragoza) a new station, Juanacatlán, was added to the west on 11 April 1970, and the first correspondencia (a transfer station) became functional on 1 August 1970 when Line 2 was opened. The two westernmost stations Tacubaya and current terminal Observatorio were inaugurated on 20 November 1970 and 10 June 1972 respectively.

Station Pantitlán was opened on 22 August 1984 as the eastern terminal during a fourth and final expansion. All twenty stations have operated since then, running a total track length of 18.83 km (11.70 mi), of which 16.65 km (10.35 mi) are passenger track. The 1 is the only line in the network that is fully underground except for some surface track in Observatorio used for maintenance.

As of 2020, an extension of Line 12 is under construction, this stretch will connect Line 12 with Line 1 at the Observatorio station.[3]

Temporary platform installed at Balderas station

Authorities warned on 10 August 2020 that Line 1 is in danger of a major fire due to an aging electrical system that is in need of major improvements. Lines 1, 2, and 3 report an average of 2.5 electrical failures daily.[6] As a result, the line started undergo renovations that require its closure. The first closure was from Pantitlán to Salto de Agua stations, starting on 11 July 2022 with March 2023 being the expected completion date. The second closure was expected to start in March 2023 from Balderas to Observatorio stations and was expected to conclude in August 2023. During both periods, all railway elements will be replaced with modern material, the wiring will be replaced, damage due to leaks and cracks will be repaired, stations that are not yet modernized will be updated, and accessibility will be added to stations that lack it.[7][8]

In April 2023, Siemens Mobility claimed that they would install CBTC on Line 1.[9] On October 29, 2023, the modernized section of Line 1 was inaugurated.[10] Salto del Agua and Balderas stations was reopened on September 13, 2024.[11] The second stage is expected to begin on 9 November 2023.[12]

Renovated Observatorio station showing the connection to the El Insurgente train.

On November 16, 2025, the Observatorio - Chapultepec section of metro line 1 was reopened, thus completing its full modernization.[13] The modernization, which included CBTC installation, is expected to increase capacity by 15%.[14]

Chronology

  • September 4, 1969: from Chapultepec to Zaragoza.
  • April 11, 1970: from Chapultepec to Juanacatlán.
  • November 20, 1970: from Juanacatlán to Tacubaya.
  • June 10, 1972: from Tacubaya to Observatorio.
  • August 22, 1984: from Zaragoza to Pantitlán.

Rolling stock

Line 1 has had different types of rolling stock throughout the years.

Currently, out of the 390 trains in the Mexico City Metro network, 49 are in service in Line 1.[15]

Station list

Key[a]
Handicapped/disabled accessFully accessible stationCablebús Line {{{3}}}Cablebús connectionRed de Transporte de PasajerosRTP connection
Handicapped/disabled accessPartially accessible stationMexibúsMexibús connectionTren InterurbanoTren Interurbano connection
Transfer hubCETRAM transfer stationMexicableMexicable connectionTren SuburbanoTren Suburbano connection
Transfer hubETRAM transfer stationMexico City MetroMexico City Metro connectionTrolleybusTrolleybus connection
EcobiciEcobici bikeshareMexico City minubusPesero connectionXochimilco Light RailXochimilco Light Rail connection

The stations from east to west:

More information Station, Opened ...
Station Handicapped/disabled access Opened Level Distance (km) Connections Location
Between
stations
Total
Pantitlán Transfer hub Handicapped/disabled access August 22, 1984 Underground N/a 0.0
  • Line 5 Line 9 Line A
  • Mexico City Metrobús Mexico City Metrobús Line 4
  • Trolleybus Trolleybus Line 2
  • Mexibús Mexibús Line 3
  • Red de Transporte de Pasajeros 168
  • Mexico City minubus 11B, 11C, 19F, 19G
Venustiano Carranza
Zaragoza Transfer hub Handicapped/disabled access September 4, 1969 1.5 1.5 Red de Transporte de Pasajeros 162B, 163, 163A, 163B, 164, 166, 167
Gomez Farías Handicapped/disabled access 0.9 2.4
Boulevard Puerto Aéreo Transfer hub Handicapped/disabled access 0.7 3.1
  • Trolleybus Trolleybus Line 4
  • Red de Transporte de Pasajeros 43
  • Mexico City minubus 20B, 22D
Balbuena Transfer hub Handicapped/disabled access 0.8 3.9 Mexico City minubus
Moctezuma Handicapped/disabled access 0.8 4.7
San Lázaro Transfer hub Handicapped/disabled access 0.7 5.4
Candelaria 1.1 6.4
Merced Handicapped/disabled access 0.9 7.3
  • Mexico City Metrobús Mexico City Metrobús Line 4
  • Mexico City minubus 5A
Pino Suárez Handicapped/disabled access 0.8 8.2
  • Mexico City Metro Line 2
  • Mexico City Metrobús Mexico City Metrobús Line 4
  • Red de Transporte de Pasajeros 2A, 31B, 111A, 145A
  • Mexico City minubus 17C, 17H, 17I, 19E, 19F, 19G, 19H
  • Ecobici
Cuauhtémoc
Isabel la Católica Handicapped/disabled access 0.5 8.7
  • Mexico City minubus 19E, 19F, 19G, 19H
  • Ecobici
Salto del Agua Handicapped/disabled access 0.6 9.3
  • Mexico City Metro Line 8
  • Trolleybus Trolleybus Line 1
  • Mexico City minubus 19E, 19F, 19G, 19H
  • Ecobici
Balderas Handicapped/disabled access 0.6 9.9
  • Mexico City Metro Line 3
  • Mexico City Metrobús Mexico City Metrobús Line 3
  • Red de Transporte de Pasajeros 34A
  • Mexico City minubus 19E, 19F, 19G, 19H
  • Ecobici
Cuauhtémoc Handicapped/disabled access 0.5 10.5
  • Mexico City Metrobús Mexico City Metrobús Line 3
  • Red de Transporte de Pasajeros 34A
  • Mexico City minubus 19E, 19F, 19G, 19H
  • Ecobici
Insurgentes Handicapped/disabled access 0.9 11.4
Sevilla Handicapped/disabled access 0.8 12.2
  • Red de Transporte de Pasajeros 19, 19A, 34A
  • Mexico City minubus 13D, 18C, 19E, 19F, 19G, 19H
  • Ecobici
Chapultepec Transfer hub 0.6 12.9
  • Mexico City Metrobús Mexico City Metrobús Line 2 Mexico City Metrobús Line 7 (at Chapultepec)
  • Trolleybus Trolleybus Line 2 Trolleybus Line 6
  • Red de Transporte de Pasajeros 11A, 13A, 34A, 115A, 200
  • Mexico City minubus 7D, 8A, 8B, 8C, 8D, 13C, 13E, 18C, 18D, 19E, 19F, 19G, 19H, 21A
  • Ecobici
Juanacatlán Handicapped/disabled access April 11, 1970 1.1 14.0
  • Red de Transporte de Pasajeros 13A, 115A
  • Mexico City minubus 21A
  • Ecobici
Miguel Hidalgo
Tacubaya Transfer hub Handicapped/disabled access November 20, 1970 1.3 15.2
  • Mexico City Metro Line 7 Line 9
  • Mexico City Metrobús Mexico City Metrobús Line 2
  • Red de Transporte de Pasajeros 110, 110B, 110C, 112, 113B, 115, 118, 119, 200
  • Mexico City minubus 1B, 9C, 9E, 21A
Observatorio Transfer hub Handicapped/disabled access June 10, 1972 Ground-level 1.4 16.7
Álvaro Obregón
Close

Ridership

The following table shows each of Line 1 stations total and average daily ridership during 2019.[23]

Transfer station
Terminal
†‡ Transfer station and terminal
More information Rank, Station ...
Rank Station Total ridership Average daily
1Observatorio26,388,11072,296
2Insurgentes20,753,67656,859
3Chapultepec19,388,67753,120
4Merced18,129,24449,669
5Pantitlán†‡17,860,45748,933
6Zaragoza16,963,49746,475
7Tacubaya12,369,80833,890
8San Lázaro11,915,09432,644
9Pino Suárez11,456,02231,386
10Sevilla11,123,52730,475
11Gómez Farías10,360,85128,386
12Candelaria8,554,56123,437
13Boulevard Puerto Aéreo8,429,97223,096
14Cuauhtémoc8,311,51122,771
15Isabel la Católica8,262,28222,636
16Moctezuma8,050,03522,055
17Balderas7,825,65621,440
18Salto del Agua7,482,56420,500
19Balbuena4,902,63913,432
20Juanacatlán4,259,22911,669
Total242,787,412665,171
Close

Tourism

Line 1 passes near several places of interest.

See also

Notes

  1. The following list was adapted from different websites and official maps.
    • Metro (Mexico City Metro) connections obtained from the official Mexico City Metro system map.[16]
    • Accessibility obtained from the Mexico City Metro system map. In some cases, the map omits the accessibility icon as the station(s) are actually partially accessible. However, the respective websites of each station on the official site indicate the respective accessibility methods. Stations with the symbol Handicapped/disabled access‡ are fully accessible; stations with the symbol Handicapped/disabled access† are partially accessible.[16]
    • Cablebús (Cablebús Line {{{3}}}) obtained from their official website.[17]
    • Centro de transferencia modal (CETRAM; Transfer hub) obtained from the official website of the Órgano Regulador de Transporte.[18]
    • Ecobici (Ecobici) obtained from their official website.[19]
    • Metrobús (Mexico City Metrobús) obtained from the Mexico City Metrobús system map.[20]
    • Mexibús (Mexibús) obtained from the official Mexico City Metro system map.[16]
    • Mexicable (Mexicable) obtained from the official Mexico City Metro system map.[16]
    • Public buses network (peseros) (Mexico City minubus) obtained from the official website of the Órgano Regulador de Transporte.[21]
    • Red de Transporte de Pasajeros (Red de Transporte de Pasajeros) obtained from their official website.[22]
    • Trolleybuses (Trolleybus) obtained from their official website.[17]

References

Related Articles

Wikiwand AI