Moseley Village railway station

Railway station in Birmingham, England From Wikipedia, the free encyclopedia

Moseley Village railway station is a railway station in Moseley, Birmingham. It was first opened in 1867 and closed in 1941. It reopened on 7 April 2026.[1]

LocationMoseley, Birmingham
England
Coordinates52.4463°N 1.8856°W / 52.4463; -1.8856
Quick facts General information, Location ...
Moseley Village
National Rail
Reopened station in 2026
General information
LocationMoseley, Birmingham
England
Coordinates52.4463°N 1.8856°W / 52.4463; -1.8856
Grid referenceSP078831
Managed byWest Midlands Railway
Transit authorityTransport for West Midlands
LineCamp Hill line
Platforms2
Train operatorsWest Midlands Railway
Other information
StatusOpen
Station codeMOV
Fare zoneTfWM Zone 3
History
Original companyMidland Railway
Pre-groupingMidland Railway
Post-groupingLondon Midland and Scottish Railway
Key dates
1 November 1867Opened as Moseley
27 January 1941Closed
7 April 2026Reopened as Moseley Village
Location
Close

History

Moseley station and buildings in 1908

The station was opened by the Midland Railway on the former Birmingham and Gloucester Railway mainline (now the Camp Hill line) on 1 November 1867.[2] Upon opening it was called Moseley, forcing an existing downline station of the same name to be renamed 'Kings Heath'.[3] From 1923, the station was operated by the London Midland and Scottish Railway.

The station closed on 27 January 1941 as an economy measure during the Second World War.[4] The buildings were demolished at some point thereafter.

Reopening

In 2007 there were proposals to reopen the station and to resume local passenger services along the Camp Hill line,[5] in which case the station would be served by trains between Birmingham Moor Street and Kings Norton railway station.[6] In 2013 the proposal was shelved indefinitely.[7]

In 2016, the newly created West Midlands Combined Authority revived the plans to restore local passenger services to the line, and declared it one of their priority transport schemes to be delivered by 2025.[8][9] In 2019, the project to re-open the stations at Moseley, Kings Heath, and Hazelwell received £15 million in Government funding, with construction due to start in 2020 and aimed for completion in time for the 2022 Commonwealth Games.[10] In March 2021 it was announced that funding had been found for the project.[11] The station was named following a public vote to choose between 'Moseley' or 'Moseley Village'.[12][13]

Construction on the station finished in December 2025, and it was handed to Transport for West Midlands (TfWM). Following this there was a period of driver training, testing and signalling work to ensure the stations are ready to open to passengers.[14] All three stations reopened on 7 April 2026.[15]

Services

The basic Monday to Saturday off-peak service in trains per hour/day is as follows:[16]

Other station facilities include, step-free access to both platforms (via lifts), ticket machines, covered bike storage, covered seating and WiFi. The station is unstaffed and managed by West Midlands Railway.

More information Preceding station, National Rail ...
Close

References

Related Articles

Wikiwand AI