Muradpur Flyover

From Wikipedia, the free encyclopedia

Official nameAkhtaruzzaman flyover
Total length6.5 km
Akhtaruzzaman flyover
LocaleChittagong
Official nameAkhtaruzzaman flyover
Characteristics
Total length6.5 km
History
Constructed byChittagong Development Authority (CDA)
Construction start2014
Construction end17 June 2017
Construction costapprox. 696 cr.[1]
The overpass from below.

The Akhtaruzzaman flyover is the largest highway overpass in Chittagong, Bangladesh. Its foundation stone was laid in 2013 by Prime Minister Sheikh Hasina; construction officially began in 2014.[citation needed][2][3]

The flyover was partially opened on 17 June 2017, and became fully accessible soon after.[4] Since its opening, the flyover has seen three auto accidents, which claimed the lives of four people.[5]

Related Articles

Wikiwand AI