Murrin Murrin Mine

Mine in Western Australia From Wikipedia, the free encyclopedia

The Murrin Murrin Mine is a major nickel-cobalt mining operation being conducted in the North Eastern Goldfields, approximately 45 km east of Leonora, Western Australia. The project was initiated as a 60/40 joint venture between Murrin Murrin Holdings, a subsidiary of Anaconda Nickel and Glenmurrin, a subsidiary of Glencore.[2] In 2003 Anaconda changed its name to Minara Resources. In November 2011, Minara Resources was acquired by Glencore.[3] The mine opened in 1999.[4]

Location
  • Leonora, Western Australia, Australia
  • 28°46′03″S 121°53′38″E
ProductsNickel, cobalt
ProductionNickel: 31,100 t
Cobalt: 2,100 t
Financialyear2023[1]
Quick facts Location, Products ...
Murrin Murrin
Murrin Murrin is located in Western Australia
Murrin Murrin
Murrin Murrin
Location in Western Australia
Interactive map of Murrin Murrin
Location
  • Leonora, Western Australia, Australia
  • 28°46′03″S 121°53′38″E
ProductsNickel, cobalt
ProductionNickel: 31,100 t
Cobalt: 2,100 t
Financial year2023[1]
Opened1999
CompanyGlencore
Websitewww.glencore.com.au
Acquired2011
Close

Geology

Murrin Murrin mines a laterite nickel ore formed by deep weathering of a peridotite ultramafic rock.

Problems with the process plant

Significant problems and delays were encountered in the design, construction and commissioning of the ore process plant at Murrin Murrin.[5]

The designers, Fluor Daniel eventually had to pay the joint venture partners $155 million in an out-of-court settlement. It was the second successful claim against Fluor, Murrin Murrin owners having been awarded $147 million from the first phase of their claim against Fluor, a sum which ultimately was reduced to $39.8 million. The Murrin Murrin project's original cost estimate of $1 billion had [clarification needed] $1.6 billion.[6] In December 1998, Anaconda Nickel terminated Henry Walker as mining contractor.[7][8]

Production

Production of the mine:

More information Year, Nickel ...
Year Nickel Cobalt
2000[4] 13,027 t 904 t
2001[4] 25,991 t 1,253 t
2002[4] 30,009 t 1,838 t
2003[9][10][11] 28,147 t 2,309 t
2004[12] 27,950 t 1,982 t
2005[12] 28,240 t 1,750 t
2006[12] 31,524 t 2,096 t
2007[12] 27,585 t 1,884 t
2008[12] 30,514 t 2,018 t
2009[13] 32,977 t 3,250 t
2010[14] 28,500 t 1,900 t
2011[14] 28,500 t 1,900 t
2012[15] 33,410 t 2,390 t
2013[16] 40,000 t 2,700 t
2014[16] 36,400 t 2,700 t
2015[17] 37,500 t 2,800t
2016[17] 35,300 t 2,800 t
2017[18] 34,700 t 2,700 t
2018[18] 35,500 t 2,900 t
2019[19] 37,000t 3,400 t
2020[19] 36,000 t 2,900 t
2021[19] 30,000 t 2,500 t
2022[20] 35,700 t 3,000 t
2023[1] 31,100 t 2,100 t