Mysore–Bangalore line

Railway line in India From Wikipedia, the free encyclopedia

Mysore–Bangalore line (officially Mysuru–Bengaluru line) is a fully electrified double line from Mysore Junction to Bangalore City.

StatusOperational
LocaleKarnataka
Termini
Quick facts Overview, Status ...
Mysore–Bangalore line
Mysore Junction
Overview
StatusOperational
OwnerIndian Railways
LocaleKarnataka
Termini
Stations24
Websitewww.swr.indianrailways.gov.in
Service
Services1
Route number74[1]
OperatorSouth Western Railway zone
DepotKrishnarajapuramTooltip Krishnarajapuram railway station
Rolling stock
History
Opened25 February 1882; 144 years ago (1882-02-25)
Technical
Line length138.25 kilometres (85.90 mi)
Number of tracks2
Track gauge1,676 mm (5 ft 6 in)
Old gauge1,000 mm (3 ft 3+38 in)
Loading gauge4,725 mm × 3,660 mm (15 ft 6.0 in × 12 ft 0.1 in) (BG)[2]
ElectrificationCompleted in December 2017
Operating speed110 km/h (68 mph)
Route map

km
Up arrow to Chamarajanagar
0.0
Mysore Junction Bus interchangeParking
Right arrow to Hassan Junction
3.9
Mysore New Goods Terminal
Right arrow to Hassan Junction
8.6
Naganahalli
12.2
Palahalli Halt
14.1
Paschima Vahini Point
14.9
Shrirangapattana
15.5
Cauvery North Point
19.5
Pandavapura
23.5
Chandagirikopal
28.6
Byadarahalli
MYSTooltip Mysore railway division limits Up arrow
SBCTooltip Bangalore railway division limits Down arrow
37.4
Yeliyur
45.2
Mandya
55.3
Hanakere
64.4
Maddur
69.6
Nidaghatta
75.7
Settihally
82.6
Channapattana
93.7
Ramanagaram
100.9
Ketohalli
108.4
Bidadi
114.9
Hejjala
125.8
Kengeri
129.3
Jnanabharati Halt
130.7
Nayandahalli
133.4
Krishnadevaraya halt
137.9
Bangalore City Bus interchangeParking
Right arrow to Yesvantpur Junction
Down arrow to Bangalore Cantonment
Close

Background

The line extends from Mysore Junction to Bangalore City falling mostly under Bangalore railway division and a few stretches under Mysore railway division within the limits of South Western Railway zone at Bangalore City.[3][4] [5]

Construction

Since the rail network in British India was entirely private affairs. The erstwhile Kingdom of Mysore established Mysore State Railway for improving rail connectivity, right after the commissioning of Madras Royapuram–Bangalore City railway line in 1879.[6] Though managing Mysore State Railway was an expensive affair, Chamarajendra Wadiyar X decided to lay a new rail from Bangalore to Mysore in 1870, and shelved the project soon.[7] Again he dusted the project and initiated the construction in 1877–1878. The 56 kilometres (35 mi) stretch between Bangalore–Channapatna was completed on 1 February 1881, the 37 kilometres (23 mi) Channapatna–Mandya stretch on 20 March 1881 and the final 45 kilometres (28 mi) Mandya–Mysore stretch was completed and the entire stretch thrown open to traffic on 25 February 1882.[8][9] The line currently has a maximum operating speed of 100 km/h (62 mph).[10] Talks are going on to increase the speed from 100 km/h (62 mph) to 130 km/h (81 mph) in order to facilitate semi high speed trains like Vande Bharat express which will reduce the time taken between the 2 cities to less than 100 minutes, but with high amount of gradients and high degree curve the construction of new railway line is a possibility.

The project to convert the Bangalore–Mysore metre gauge to broad gauge is approved in 1979–80.[11]

Development

Sanctioned in 2009–2010, the railways took up the state's demand for doubling as well electrification at an estimated cost of 505 crore (US$52 million) which was later revised to 526.31 crore (US$55 million) and finally escalated to 874.75 crore (US$91 million). Land acquisition of about 160 acres (65 ha), especially 25 acres (10 ha) near Mandya alone have been done as part of double line and improving stations between Ramanagaram and Mysore Junction.[12]

The electrification of the line had been completed and was inaugurated by Prime Minister Narendra Modi on 20 February 2018.[13]

References

Related Articles

Wikiwand AI