NTPL Thermal Power Station is a 1000 MW (2×500 MW) coal-based thermal plant in the Tuticorin District of Tamil Nadu. The project is a joint venture of TNPGCL and NLC India Limited. The units were commissioned in March and April 2015, respectively.[1]
CountryIndia
LocationHarbour Estate, Thoothukudi, Tamil Nadu
Coordinates8°45′32″N 78°10′54.8″E
StatusOperational
| NTPL Thermal Power Station | |
|---|---|
![]() Location of the NTPL Thermal Power Station | |
| Country | India |
| Location | Harbour Estate, Thoothukudi, Tamil Nadu |
| Coordinates | 8°45′32″N 78°10′54.8″E |
| Status | Operational |
| Commission date | Unit 1: March 2012 Unit 2: August 2012 |
| Owners | TNPGCL, NLC India Limited |
| Operators | TNPGCL NLC |
| Thermal power station | |
| Primary fuel | Coal |
| Power generation | |
| Units operational | 2 X 500 MW |
| Nameplate capacity | 1000 MW |