Wikiwand AI

Narre Warren railway station

Railway station in Melbourne, Australia From Wikipedia, the free encyclopedia

Narre Warren station is a railway station operated by Metro Trains Melbourne on the Pakenham line, which is part of the Melbourne rail network. It serves the south-eastern suburb of the same name, in Melbourne, Victoria, Australia.

Coordinates38°01′40″S 145°18′14″E
SystemPTV commuter rail station
Quick facts General information, Location ...
Narre Warren
North-west bound view from Platform 1, May 2025
General information
LocationWebb Street,
Narre Warren, Victoria 3805
City of Casey
Australia
Coordinates38°01′40″S 145°18′14″E
SystemPTV commuter rail station
OwnerVicTrack
OperatorMetro Trains
LinePakenham
Distance40.80 kilometres from
Southern Cross
Platforms2 side
Tracks2
ConnectionsList of bus routes in Melbourne Bus
Construction
Structure type
Elevated
Parking573 spaces
Cycle facilities
10 racks
AccessibleYes — step free access
Other information
StatusOperational, premium station
Station codeNWA
Fare zoneMyki Zone 2
WebsitePublic Transport Victoria
History
Opened10 March 1882; 144 years ago (1882-03-10)
Rebuilt2 June 1995
28 March 2024 (LXRP)
ElectrifiedJuly 1954 (1500 V DC overhead)
Passengers
2005–2006561,247[1]
2006–2007663,386[1]Increase 18.19%
2007–2008776,240[1]Increase 17.01%
2008–2009818,765[2]Increase 5.47%
2009–2010803,995[2]Decrease 1.8%
2010–2011791,052[2]Decrease 1.6%
2011–2012737,782[2]Decrease 6.73%
2012–2013Not measured[2]
2013–2014785,600[2]Increase 6.48%
2014–2015788,012[1]Increase 0.3%
2015–2016856,433[2]Increase 8.68%
2016–2017847,096[2]Decrease 1.09%
2017–2018733,569[2]Decrease 13.4%
2018–2019658,699[2]Decrease 10.2%
2019–2020587,550[2]Decrease 10.8%
2020–2021309,300[2]Decrease 47.35%
2021–2022318,150[3]Increase 2.86%
2022–2023429,650[3]Increase 35.04%
Services
Preceding station Railways in Melbourne Metro Trains Following station
Hallam Pakenham line Berwick
Track layout
Troups Creek
1
2
Location
Close

Narre Warren station is an elevated hybrid premium station, featuring two side platforms. It opened on 10 March 1882, with the current station provided in March 2024.[4]

History

Narre Warren station opened on 10 March 1882 as a single platform, just over four years after the railway line from Dandenong was extended to Pakenham.[4] Like the suburb itself, the station carries the name of an Aboriginal word believed to mean 'small hills'.[5]

In 1956, the line between Dandenong and Narre Warren was duplicated,[4] with duplication to Berwick provided in 1962.[4] As part of the duplication to Berwick, an island platform was provided, as well as boom barriers replacing interlocked gates at the former Webb Street level crossing which, at the time, was located at the down end of the station.[4][6]

In 1970, a crossover between No. 2 and No.3 roads was abolished.[4] In 1974, flashing light signals were provided at the former Cranbourne Road level crossing,[4] which was located nearby in the down direction of the station. In 1978, the waiting room at the original station was demolished.[7]

In 1986, boom barriers were provided at the Cranbourne Road level crossing.[6] By 1988, No. 2 road was booked out of use, as well as points at each end of the road and a crossover at the up end of the station.[4] In 1989, the signal box was abolished.[4]

On 2 June 1995, the station was relocated to the east side of the Webb Street level crossing, and reopened to the public the following day.[8]

In October 2003, Narre Warren was upgraded to a premium station. In 2004, the Cranbourne Road level crossing was grade separated, being replaced with a road underpass.[9][10]

On 29 July 2021, the Level Crossing Removal Project announced that the Webb Street level crossing would be grade separated by 2025, with a rail over road "hybrid" design.[11][12][13][14][15] Webb Street was to be lowered and a rail bridge built over the road,[16] with the station to be rebuilt as part of those works.[17][18] However, on 14 January 2022, the LXRP announced that the "hybrid" design would be replaced with a rail over road design, removing the need to lower Webb Street.[19] On 23 August of that year, final designs for the level crossing removal and rebuilt station were released.[20][21][22]

On 24 November 2023, a 'construction blitz' began, which saw the station close and demolished, while trains stopped running on sections of the Pakenham line.[23] On 10 December of that year, the construction blitz ended, with trains on the Pakenham line resuming the following day, operating on the rail-over-road bridge without stopping at Narre Warren.[24] Services resumed stopping at the station as it reopened on 28 March 2024.[25]

Platforms, facilities and services

Narre Warren has two side platforms. It is located on top of Webb Street, which also provided station access. The 2003 station featured a semi-large fibro building was located at the Flinders Street (Up) end of the station, which housed an enclosed waiting area, toilets and ticket facilities. There was a myki ticket vending machine inside the waiting area. There was also a small café located next to the entrance of the building, which was open during the morning peak-hour, selling coffee and newspapers. A Protective Service Officers' (PSO) pod was located next to the station building, which was used from 6:00 pm until the last service every day.

Narre Warren is served by Pakenham line trains.[26] On average, there are three off-peak services per hour on weekdays, travelling to and from Flinders Street, with more frequent services during peak-hours, and three services an hour on weekends.

More information Platform, Line ...
Narre Warren platform arrangement
Platform Line Destination Via Service Pattern Source
1  Pakenham line  Sunbury, Watergardens, West Footscray Town Hall Limited express [27]
2  Pakenham line  East Pakenham All stations [27]
Close

Cranbourne Transit operates one bus route via Narre Warren station, under contract to Public Transport Victoria:

  •  895 : Narre Warren SouthWestfield Fountain Gate[28]

Ventura Bus Lines operates two routes via Narre Warren station, under contract to Public Transport Victoria:

Before rebuild

After rebuild

References

Related Articles

Timelines

Top Qs

Fact Checks