Navrongo Solar Power Station
From Wikipedia, the free encyclopedia
CountryGhana
StatusOperational
| Navrongo Solar Power Station | |
|---|---|
![]() | |
| Country | Ghana |
| Location | Navrongo Kassena-Nankana District Upper East Region |
| Coordinates | 10°55′24″N 01°03′19″W / 10.92333°N 1.05528°W |
| Status | Operational |
| Construction began | 2012 |
| Commission date | 2013 |
| Owner | Volta River Authority |
| Solar farm | |
| Type | Flat-panel PV |
| Power generation | |
| Nameplate capacity | 2.5 MW (3,400 hp) |
Navrongo Solar Power Station is a 2.5 MW (3,400 hp) solar power plant in Ghana.[1]
The power station is located near the town of Navrongo, Kassena-Nankana District in the Upper East Region of Ghana. This location lies approximately 820 kilometres (510 mi) by road, north of Accra, the country's capital and largest city.[2]
Overview
Built at a cost of just over US$8 million, the plant is the first grid-ready solar station in the country. It is owned by Volta River Authority (VRA), the Ghanaian parastatal responsible for public electricity generation. The power plant was commissioned in 2013.[3]
