Wikiwand AI

Netanya–Sapir railway station

Railway station in Israel From Wikipedia, the free encyclopedia

Netanya–Sapir railway station (Hebrew: תחנת הרכבת נתניה – ספיר, Taḥanat HaRakevet Netanya Sapir) is an Israel Railways station located in Kiryat Sapir [he] (also known as Sapir/Poleg industrial zone) in southern Netanya, on the North-South coastal line.

LocationYad Harutzim 13, Netanya
Coordinates32°16′49″N 34°51′54″E
Platforms2
Tracks2
Quick facts General information, Location ...
Netanya–Sapir

נתניה – ספיר
Israel Railways
General information
LocationYad Harutzim 13, Netanya
Coordinates32°16′49″N 34°51′54″E
Platforms2
Tracks2
Construction
Parking283 spaces
Cycle facilities
34 spaces
Accessibleyes
History
Opened5 November 2016; 9 years ago (2016-11-05)
Electrified17 September 2022; 3 years ago (2022-09-17)
Passengers
20191,155,205[1]
Rank36 out of 68
Location
Close

History

The plan to build the station was initiated in March 2001. The initial plan was for the station to be built by a private developer who would build a commercial center nearby.[2] In September 2002, the doubling of the coastal railway from two to four tracks on the Haifa-Tel Aviv section was also approved. This is with the aim of allowing suburban and intercity trains to travel on the four tracks simultaneously.[3]

The station plan was approved by the District Planning and Building Committee in June 2012. In March 2014, the tender for the construction of the station was published,[4] and the station opened on November 5, 2016.[5] The cost of building the station was approximately 70 million NIS.

In 2021, work began at the station to install an overhead electrical supply system by the Spanish company SEMI, and on September 3, 2022, the first electric train ran at the station. The system provides an alternating voltage of 25,000 volts at a frequency of 50 Hz and allows mobile railway equipment with a pantograph to operate at the station. Israel Railways currently has Bombardier Trax locomotives hauling double-deck cars from the same manufacturer and Desiro HC electric railcars manufactured by Siemens.

More information Preceding station, Israel Railways ...
Preceding station Israel Railways Following station
Netanya
towards Binyamina
Binyamina–Beersheba Beit Yehoshua
Close

Station layout

Platform numbers increase in an East-to-West direction

Side platform
Platform 1      Nahariya–Modi'in trains toward Modi'in–Center do not stop here →
          Nahariya–Beersheba and Karmiel–Beersheba trains toward Be'er Sheva–Center do not stop here →
     Binyamina–Beersheba trains toward Be'er Sheva–Center (Beit Yehoshua) →
     Netanya–Rehovot trains toward Rehovot (peak hours only) do not stop here →
     Netanya–Beit Shemesh trains toward Beit Shemesh (peak hours only) do not stop here →
     Night Train toward Ben Gurion Airport does not stop here →
Platform 2 ←           Nahariya–Modi'in and Nahariya–Beersheba trains toward Nahariya do not stop here
←      Karmiel–Beersheba trains toward Karmiel do not stop here
←      Binyamina–Beersheba trains toward Binyamina (Netanya)
←           Netanya–Rehovot and Netanya–Beit Shemesh trains toward Netanya (peak hours only) do not stop here
←      Night Train toward Nahariya does not stop here
Side platform

Ridership

More information Year, Passengers ...
Passengers boarding and disembarking by year
YearPassengersRankSource
2021 630,966 (Increase 223,382) 32 of 66 (Increase 2) 2021 Freedom of Information Law Annual Report
2020 407,584 (Decrease 747,621) 34 of 68 (Increase 2) 2020 Freedom of Information Law Annual Report
2019 1,155,205 36 of 68 2019 Freedom of Information Law Annual Report
Close

References

Related Articles

Timelines

Top Qs

Fact Checks