New Central Wastewater Treatment Plant

From Wikipedia, the free encyclopedia

LocationSongino Khairkhan, Ulaanbaatar, Mongolia
Coordinates47°54′09″N 106°45′45″E / 47.90250°N 106.76250°E / 47.90250; 106.76250
Groundbreaking28 February 2019
New Central Wastewater Treatment Plant
Төв цэвэрлэх байгууламж
Interactive map of the New Central Wastewater Treatment Plant area
General information
Typewastewater treatment plant
LocationSongino Khairkhan, Ulaanbaatar, Mongolia
Coordinates47°54′09″N 106°45′45″E / 47.90250°N 106.76250°E / 47.90250; 106.76250
Groundbreaking28 February 2019
CostUS$262.7 million
Technical details
Grounds17.7 hectares

The New Central Wastewater Treatment Plant (Mongolian: Төв цэвэрлэх байгууламж) is a wastewater treatment plant under construction in Songino Khairkhan District, Ulaanbaatar, Mongolia.

The feasibility study to establish the plant was done in 2015. The construction of the plant was officiated on 2 February 2019 and constructed officially started on 28 February 2019 in a groundbreaking ceremony officiated by Prime Minister Ukhnaagiin Khürelsükh.[1] On 31 March 2022, concrete started to be poured into the inner walls of the plant three reaction tanks.[2] In July 2025, the plant received its first trial inflow of.[3]

Architecture

The plant is constructed in a 17.7 hectares of land. There are 35 buildings being constructed at the plant site.[1]

Technical specifications

Once completed, the plant will have a processing capacity of 250,000 m3 of wastewater per day.[2]