New Haven State Street station

Railroad station in Connecticut From Wikipedia, the free encyclopedia

New Haven State Street station is a commuter rail station located on State Street in downtown New Haven, Connecticut. The secondary railroad station in the city, it is located 0.8 miles (1.3 km) northeast of the much larger New Haven Union Station and is intended to offer easier access to New Haven's downtown business district. It is served by CT Rail Shore Line East and Hartford Line commuter trains, Amtrak Hartford Line trains, Springfield-terminating Northeast Regional trains, and Valley Flyer trains, and a limited number of Metro-North Railroad New Haven Line trains. Originally proposed in 1996, State Street opened on June 7, 2002. A second platform opened on June 8, 2018, in time for the beginning of Hartford Line service.

Location259 State Street
New Haven, Connecticut
United States
Coordinates41.305763°N 72.921753°W / 41.305763; -72.921753
OwnerCTDOT
Lines
Quick facts General information, Location ...
New Haven – State St
New Haven State Street station in September 2018
General information
Location259 State Street
New Haven, Connecticut
United States
Coordinates41.305763°N 72.921753°W / 41.305763; -72.921753
OwnerCTDOT
Lines
Platforms1 island platform
1 side platform
Tracks4
ConnectionsLocal Transit CT Transit: 204, 206, 212, 223, 274, 278
Local Transit Yale Shuttle: Red Line
Construction
Cycle facilities
Racks, Bike New Haven bikeshare station
AccessibleYes
ArchitectMichael Baker International
Other information
Station codeAmtrak: STS
Fare zone21 (Metro-North)
History
OpenedJune 7, 2002[1]
Rebuilt2017–2018
Passengers
FY 202520,695 annually[2] (Amtrak)
2018201 daily boardings[3] (Metro-North)
2019177 daily boardings[4] (Shore Line East)
Services
Preceding station Amtrak Following station
New Haven Northeast Regional Wallingford
New Haven
Terminus
Hartford Line
Valley Flyer Wallingford
toward Greenfield
     Acela does not stop here
     Vermonter does not stop here
Preceding station CT Rail Following station
New Haven Union Station
Terminus
Shore Line East Branford
toward New London
New Haven Union Station
limited weekday service
toward Stamford
New Haven Union Station
Terminus
Hartford Line Wallingford
Preceding station Metro-North Railroad Following station
New Haven New Haven Line
peak service
Terminus
Location
Close

Station design

The Northeast Corridor has four tracks at this location, in a shallow cut. From southeast to northwest, the tracks are numbered 1, 2, 4 and 6. State Street has a three-car-long high-level island platform between tracks 4 and 6, and a 344 feet (105 m) four car-long side platform serving track 1. Track 2 is used only by trains bypassing the station.[5] The station originally only had the island platform when it opened; the side platform was built for the 2018 opening of the Hartford Line.[6][7] Because the side platform was not part of the original station, the two platforms are not directly connected and are accessed separately, with two pedestrian bridges, staircases and elevators connecting the platforms to the street-level entrance and busway.

History

Second platform under construction in December 2017

A station closer to New Haven's business district than Union Station was first proposed in 1996.[8] The station opened on June 7, 2002, for Shore Line East service, with Metro-North service added on June 24, 2002.[1][8]

Construction on the second platform began in July 2016, using $10 million in federal funding from a Transportation Investment Generating Economic Recovery grant.[9][10] The second platform was originally expected to be complete by the end of 2017.[11] The construction of the second platform was paired with security improvements, LED walkway and platform lighting, a sheltered bicycle parking area, platform snow melters, and real-time train information displays.[12] Hartford Line and New Haven–Springfield Shuttle service began on June 16, 2018.[13] Most Shore Line East and all Hartford Line trains (both Amtrak and CT Rail) stop at the station.[14]

CTDOT plans to make additional changes to the station. The Court Street road bridge will be replaced with a 16-foot (4.9 m)-wide pedestrian and bicycle bridge at a cost of $16 million. The existing island platform will be demolished and rebuilt, with connections to both footbridges. It will have 394 feet (120 m) of platform face (enough for four cars) on the west side and 540 feet (160 m) of platform face (long enough for six cars) on the east side. Cost of the platform work is anticipated to be $97 million. As of January 2026, the Court Street work is expected to last from spring 2027 to mid-2028, with the platform work lasting from spring 2029 to fall 2030.[15]

References

Related Articles

Wikiwand AI