Nissan Stadium (2027)
Future stadium in Nashville, Tennessee
From Wikipedia, the free encyclopedia
Nissan Stadium is an indoor multi-purpose stadium currently under construction in Nashville, Tennessee, scheduled to open in 2027. It is to replace the existing Nissan Stadium as the home venue for the Tennessee Titans of the National Football League (NFL).[2][3] The 60,000-seat stadium is projected to cost $2.1 billion, including $1.26 billion of public money—the largest stadium subsidy in U.S. history.[4] It is being built next to the existing Nissan Stadium (built in 1999 and previously named Adelphia Coliseum, The Coliseum, and LP Field), which will be demolished after its completion. The stadium is being designed by Manica Architecture.[5] The stadium will host Super Bowl LXIV in 2030.[6][7]
Conceptual rendering | |
![]() Interactive map of Nissan Stadium | |
Former names | New Titans Stadium (construction) |
|---|---|
| Location | Nashville, Tennessee, U.S. |
| Coordinates | 36°10′03.8″N 86°46′05″W |
| Owner | Government of Nashville |
| Operator | Tennessee Titans |
| Capacity | 60,000 |
| Roof | Translucent (ETFE) |
| Surface | Artificial turf |
| Public transit | WeGo Public Transit - Titans Express Train - Riverfront Station |
| Construction | |
| Groundbreaking | February 29, 2024 |
| Opened | 2027 (planned) |
Construction cost | US$2.1 billion |
| Architect | Manica Architecture |
Structural engineer | Walter P Moore |
General contractor | Tennessee Builders Alliance (AECOM Hunt/Turner Construction/I.C.F. Builders/Polk & Associates)[1] |
| Tenants | |
| Tennessee Titans (NFL) Planned Tennessee State Tigers (NCAA) Planned Music City Bowl (NCAA) Planned | |
History
Background
Nissan Stadium, an open-air concrete-and-steel stadium that seats 69,000, has served as the home venue for the Tennessee Titans since its opening in 1999. The city hired an independent group, Venue Solutions Group (VSG), to assess its condition and the cost of maintaining it for the remainder of the lease, which ends in 2039. VSG's preliminary report concluded that it would cost the city between $1.75 and 1.95 billion to renovate Nissan Stadium as a "first class condition" facility.[8]
Planning and construction
The $2.1 billion cost of the new stadium will come from:
- $840 million from the team
- $500 million from the state of Tennessee
- $760 million from revenue bonds issued by the Metro Sports Authority to be repaid via personal-seat license sales and taxes collected at the stadium and additional money from a new 1% hotel/motel tax.

The 1.7-million-square-foot proposed stadium would be a dome, have a seating capacity of 55,000–60,000, have about 170 luxury suites and an artificial turf field.[9] The Titans would sign a 30-year lease to play in the stadium.
The financing program was confirmed by a 26–11 vote on April 25, 2023. Construction began in 2024.[10]
The route of the IndyCar Series Music City Grand Prix, which ran on city streets, was originally to be changed during the new stadium's construction. However, on February 14, 2024, it was announced that the race would be moved to nearby Nashville Superspeedway, which also hosted the race in 2025 and 2026.[11][12]
In July 2025, a noose was discovered, delaying construction of New Nissan Stadium while the Metropolitan Nashville Police Department investigated. On July 24, it was announced that no charges would be filed in the incident.[13]
On May 19, 2026, it was announced that the stadium would host Super Bowl LXIV in 2030.[7][14]